WwSETH SMITH NOLTING `1 ABULATION OF BIDS
<br /> 7804 Industrial Park Road,Baxter,MN 56425 NAME: 2006 Roadway Improvements
<br /> PHONE 218-829-5117 CLIENT:City of Pequot Lakes DATE: April 26,2006
<br /> PROJECT NO: 130B032 TIME:11:00 AM
<br /> Anderson Brothers Construction Co. Tri-City Paving
<br /> P.O.Box 668 P.O.Box 326
<br /> Brainerd,MN 56401 Little Falls,MN 56345
<br /> CONT[1ACT.,• TJNII
<br /> Ik1..:......... ........:.:::.......::::...........:.:...........::...........:.:.........::....... .
<br /> :RICE::::::::::::::::€ Pk1�t�G1NI €€
<br /> N::)'TY:
<br /> UNIT:-:::::::::::::::::'::::::P1tTCE:::::::::::::::'::::::AMOUNT:::::::::::::::::::::::...........P
<br /> $ RIPCIIN::::::::::::::::::':::::::::::::::::::::::::::::::'::::::::::::.4UA...?.... ............ ...................................... ......................................
<br /> 2021.501 MOBILIZATION 1 LUMP SUM $5,753.60 $5,753.60 7500.00 $7,500.00
<br /> 2101.502 CLEARING 0.07 ACRE $17,318.86 $1,212.32 20000.00 $1,400.00
<br /> 2101.506 GRUBBING 0.07 ACRE $17,318.86 $1,212.32 20000.00 $1,400.00
<br /> 2104.513 SAWING BITUMINOUS PAVEMENT(FULL DEPTH) 430 L.F. $3.56 $1,530.80 3.50 $1,505.00
<br /> 2105.501 COMMON EXCAVATION P) 1853 CU YD $3.52 $6,522.56 6.00 $11,118.00
<br /> 2105.525 TOPSOIL BORROW C 1456 CU YD $10.67 $15,535.52 15.00 $21,840.00
<br /> 2118.502 AGGREGATE SURFACING CLASS 5 300 TON $12.02 $3,606.00 10.00 $3,000.00
<br /> 2211.503 AGGREGATE BASE CLASS 5 4441 TON $8.93 $39,658.13 10.00 $44,410.00
<br /> 2221.501 AGGREGATE SHOULDERING CLASS 5 355 TON $20.01 $7,103.55 13.00 $4,615.00
<br /> 2350.501 TYPE LV4 WEARING COURSE MIXTURE 1918 TON $42.69 $81,879.42 42.00 $80,556.00
<br /> 2503.571 INSTALL 15"CORRUGATED STEEL PIPE CULVERT 60 L.F. $8.38 $502.80 40.00 $2,400.00
<br /> 2501.515 INSTALL 15'CORRUGATED STEEL PIPE APRON 2 L.F. $28.44 $56.88 100.00 $200.00
<br /> 2563.501 TRAFFIC CONTROL 1 LUMP SUM $1,000.00 $1,000.00 2000.00 $2,000.00
<br /> 2573.502 SILT FENCE,TYPE MACHINE SLICED 480 L.F. $2.20 $1,056.00 3.00 $1,440.00
<br /> 2575.501 TEMPORARY SEEDING 2.71 ACRE $295.00 $799.45 295.00 $799.45
<br /> 2575.502 TEMPORARY SEED MIXTURE,MnDOT 150 109 LBS. $1.90 $207.10 1.90 $207.10
<br /> 2575.511 TEMPORARY MULCH MATERIAL,TYPE 1 5.42 TON $120.00 $650.40 120.00 $650.40
<br /> 2575.519 TEMPORARY DISC NCHORING 2.71 ACRE $125.00 $338.75 125.00 $338.75
<br /> 2575.532 TEMPORARY COMMERCIAL FERTILIZER,TYPE 23-0-3 542 LBS. $0.32 $173.44 1.00 $542.00
<br /> 2575.501 SEEDING 2.71 ACRE $295.00 $799.45 205.00 $555.55
<br /> 2575.502 SEED MIXTURE,MnDOT 240 204 LBS. $2.35 $479.40 2.35 $479.40
<br /> 2575.511 MULCH MATERIAL,TYPE 1 5.42 TON $120.00 $650.40 120.00 $650.40
<br /> 2575.519 DISC ANCHORING 2.71 ACRE $125.00 $338.75 125.00 $338.75
<br /> 2575.532 COMMERCIAL FERTILIZER,ANALYSIS 23-0-30 813 LBS. $0.32 $260.16 1.00 $813.00
<br /> TOTAL $171,327.20 $188,758.80
<br /> I hereby certify that this tabulation is a true and correct copy of the bids for
<br /> the 2006 Roadway Improvements,Pequot Lakes,MN.
<br /> NAME: Michael Rude,P.E. REG.NO. DATE
<br />
|