My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 - Water/Wastewater Report and 2006 Goals
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
04-04-2006 Council Meeting
>
08 - Water/Wastewater Report and 2006 Goals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2016 3:05:12 PM
Creation date
7/1/2016 3:05:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pequot lakes <br /> Monthly water wastewater report <br /> Date: March 29, 2006 <br /> Month: March 2006 <br /> Waterplant: All is working good. Changed out chlorine <br /> cylinder this month. Cleaned plant, changed air filters in <br /> dryers. Working on the SCADA computer system, it seems to <br /> be jamming up and not giving the proper data, flow totals and <br /> ability to control the system. Had AE2S look at the system. [see <br /> report). <br /> Ponds blowers: The blower building was painted this month. <br /> repaired # 3 blower and installed the proper guard, locked out <br /> tag and put # 3 blower in line. All working except it does not <br /> put out as much pressure as the other blowers. I am looking at <br /> replacing the sheave for more speed. <br /> Fire hydrants: Water distribution service line to the oasis is not <br /> able to be shut off, will have to dig up after frost out to repair. <br /> Mean while we will have to isolate the main line to shut down <br /> the Oasis for replacement of his main meter due to a fire which <br /> destroyed the meter. <br /> Lift stations: All working fine still waiting for bids to install a <br />
The URL can be used to link to this page
Your browser does not support the video tag.