My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.01 - Update on Funding Options by BLADC
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
04-04-2006 Council Meeting
>
05.01 - Update on Funding Options by BLADC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 11:18:07 AM
Creation date
7/1/2016 2:55:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
`., Project Summaries <br /> Both projects proposed would occur within the city limits of Pequot Lakes. <br /> Government Drive <br /> This project consists of 5 blocks of Government Drive from east Woodman Street on the <br /> south, across County State Aid Highway 11/Main Street to East Grove Street on the <br /> north. The reconstruction consists of storm drainage system, bituminous street with on <br /> street diagonal or 90-degree parking on both sides and concrete curb and gutter and <br /> sidewalks on the east side. <br /> Estimated Costs: <br /> Street Construction $500,000 <br /> Storm Drainage and infiltration basin land acquisition $100,000 <br /> Aesthetic improvements $50,000 <br /> Subtotal $650,000 <br /> Contingencies(10%) $65,000 <br /> Study phase, design engineering phase, and preliminary $71,500 <br /> assessment <br /> Bonding Costs(5%) $36,000 <br /> Construction phase engineering and final assessment(10%)$71,500 <br /> Total Estimated Project Cost $894,000 <br /> Brunes Royce Addition <br /> This project consists of extending city sewer and water infrastructure and street <br /> improvements. The property is currently privately owned. The engineering firm has <br /> estimated the project costs, if distributed between owners based on acreage, is equal to an <br /> assessment of$26,430 per acre(with watermain looping). There is a total of 59 acres in <br /> this development, all privately owned. <br /> Estimated Costs: <br /> Construction(including sanitary sewer, watermain $1,181,339 <br /> (with looping), storm sewer, and 44' F-F street <br /> improvements) <br /> Contingencies(101/6) $118,134 <br /> Subtotal 1,299,473 <br /> Engineering, Legal, Administration(20%) $259,895 <br /> Total Estimated Project Cost $1,559,367 <br /> City of Pequot Lakes Infrastructure Funding <br />
The URL can be used to link to this page
Your browser does not support the video tag.