My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 - Assessment Policy
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
02-07-2006 Special Council Meeting
>
03 - Assessment Policy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 2:14:15 PM
Creation date
6/28/2016 2:14:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ASSESSMENT PROCEDURES &POLICY <br /> City of Pequot Lakes, Minnesota <br /> Prepared with assistance by Widseth, Smith,Nolting <br /> *** DRAFT *** January 2006 *** DRAFT *** <br /> New Reconstructed <br /> Type Method Project Assessed Project Assessed <br /> Roadway Front Foot 100% 70% <br /> Storm Sewer Front Foot 100% 70% <br /> Sanitary Sewer Per Parcel 100% 70% <br /> Watermain Per Parcel 100% 70% <br /> STANDARD OR TYPICAL SIZES: <br /> The following shall be considered standard sizes. <br /> Construction of improvements larger, wider, or more extensive than those listed shall be <br /> considered oversized. The oversized portion costs shall be paid for by the City "at large". <br /> Type Residential Commercial <br /> Roadway 36 ft F-F urban 44 ft F-F urban <br /> Storm Sewer No Standard Size No Standard Size <br /> Sanitary Sewer 8-inch 8-inch <br /> Watermain 8-inch 8-inch <br /> PROCEDURES FOR SPREADING ASSESSMENTS: <br /> `. Roadways <br /> Costs include—but are not limited to - grading, curb and gutter, sidewalks,base, <br /> surfacing, striping, lighting, erosion control, traffic control, and landscaping. <br /> Residential property with a roadway improved on its side lot will be assessed one-quarter <br /> (1/4) of the side lot footage at the same rate as front footage. <br /> Commercial property side lot footage will be assessed at the same rate as front footage <br /> (i.e. no 1/4 side lot credit approach used). <br /> Storm Sewer <br /> Costs include—but are not limited to -pipe, catch basins, riprap, swales, infiltration <br /> basins, erosion control, and landscaping. <br /> The City Council can prorate storm sewer improvements or some components of the <br /> storm sewer improvements based on an overall drainage area that may extend beyond a <br /> specific project's limits (e.g. a portion of the cost of an infiltration basin that could serve <br /> future drainage areas). <br /> Sanitary Sewer and Watermain <br /> Costs include—but are not limited to -pipe,manholes,wyes, service laterals/pipe, risers, <br /> valves, fittings, curb stops, hydrants, erosion control, and landscaping. <br /> Page 2 of 3 <br /> C:\Documents and Settings\Administrator\Local Settings\Temporary Internet Files\OLKB\Draft Assessment Policy.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.