Laserfiche WebLink
Preliminary Estimate of Cost <br /> Trailside Estates <br /> Streets, Sanitary Sewer, and Watermain <br /> Sentinel Street Trailside Road <br /> Approximate Construction Length (ft) 865 2,375 <br /> Roadway Construction Cost($/ft) $ 30.87 $ 30.87 <br /> Sanitary Sewer Construction Cost($/ft) $ 27.50 $ 27.50 <br /> Watermain Construction Cost($/ft) $ 26.45 $ 26.45 <br /> Storm Sewer Construction Cost*($/ft) $ - $ - <br /> Total Construction Cost($/ft) $ 84.82 $ 84.82 <br /> Total Construction Cost/Street $ 73,365.56 $ 201,437.24 <br /> Lift Station/Electrical Cost $ 125,000.00 <br /> Total Construction Cost/Project $ 399,802.80 <br /> Construction Contingencies(15%) $ 59,970.42 <br /> Design Engineering (10%) $ 39,980.28 <br /> Construction Phase Services(10%) $ 39,980.28 <br /> Funding Costs**(5%) $ 19,990.14 <br /> Administrative and Legal Costs-Assessments(10%) $ 39,980.28 <br /> Total Estimated Cost/Street $ 599,704.20 <br /> Total Estimated Project Cost $599,704.20 <br /> * culverts&other misc. appurtenances <br /> included in roadway cost <br /> ** does not include bond interest,which <br /> will vary with term and rate <br /> JAI 30PQLAK\0000-General\Cost Estimate-Trailside Estates.As <br />