My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 - Trailside Estates
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
01-11-2006 Special Council Meeting
>
03 - Trailside Estates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:55:39 PM
Creation date
6/28/2016 1:55:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary Estimate of Cost <br /> Trailside Estates <br /> Streets, Sanitary Sewer, and Watermain <br /> Sentinel Street Trailside Road <br /> Approximate Construction Length (ft) 865 2,375 <br /> Roadway Construction Cost($/ft) $ 30.87 $ 30.87 <br /> Sanitary Sewer Construction Cost($/ft) $ 27.50 $ 27.50 <br /> Watermain Construction Cost($/ft) $ 26.45 $ 26.45 <br /> Storm Sewer Construction Cost*($/ft) $ - $ - <br /> Total Construction Cost($/ft) $ 84.82 $ 84.82 <br /> Total Construction Cost/Street $ 73,365.56 $ 201,437.24 <br /> Lift Station/Electrical Cost $ 125,000.00 <br /> Total Construction Cost/Project $ 399,802.80 <br /> Construction Contingencies(15%) $ 59,970.42 <br /> Design Engineering (10%) $ 39,980.28 <br /> Construction Phase Services(10%) $ 39,980.28 <br /> Funding Costs**(5%) $ 19,990.14 <br /> Administrative and Legal Costs-Assessments(10%) $ 39,980.28 <br /> Total Estimated Cost/Street $ 599,704.20 <br /> Total Estimated Project Cost $599,704.20 <br /> * culverts&other misc. appurtenances <br /> included in roadway cost <br /> ** does not include bond interest,which <br /> will vary with term and rate <br /> JAI 30PQLAK\0000-General\Cost Estimate-Trailside Estates.As <br />
The URL can be used to link to this page
Your browser does not support the video tag.