My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.02 - BLADC Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
01-03-2006 Council Meeting
>
05.02 - BLADC Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 12:47:54 PM
Creation date
6/28/2016 12:47:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 3 <br /> Shading on the map represents available lots. Click on a lot to find out more information. <br /> SITE PROFILE <br /> Available: 17.51 acres(total acres 75) <br /> Price: $30,000 per acre <br /> Topography: level <br /> Zoned: Light Industrial(Zoning Ordinance) <br /> Water <br /> Supplier: Pequot Lakes Municipal, (218)568-5604 <br /> Source: Municipal Wells <br /> Storage cap.: 200,000 gal. <br /> Pumping cap.: 300 gal./minute <br /> Ave. demand: 113,498 gal./day <br /> Rates: $500 connection fee+ <br /> Base chg. $10.25/2,000 gal.;$3.20/1,000 gal. <br /> Wastewater <br /> Supplier: Pequot Lakes Municipal, (218)568-5604 <br /> Treatment Type: Spray Irrigation <br /> Cap. of Plant: 122,000 gal./day <br /> Average Demand: 92,000 gal./day <br /> Peak Demand: 98,000 gal./day <br /> Rates: $700 connection fee+ <br /> Base chg. $10.50/2,000 gal.;$3.20/1,000 gal. <br /> Natural Gas <br /> Supplier: Northern States Power/Xcel Energy, (218)828-1188 <br /> Size of nearest line: 6 inch <br /> �. Electricity <br /> Supplier: Minnesota Power, (218)587-4401 <br /> Voltage available: 7,200 V, Phase 3 power <br /> KW Transformer capacity up to 750 KVA <br /> Telecommunications <br /> Supplier: TDS Telecom, (218)568-0000 <br /> Services: Equal Access,Voice Mail, ISDN, Fiber Optics, Frame Relay,Video <br /> Conferencing, Local Internet Access, Centrex <br /> Transportation <br /> Distance mjr hwy: MN 371 (.25 miles north) <br /> Access road load: 10 tons <br /> Load factor in park: 10 tons <br /> Distance to airport: 28 miles-Brainerd Lakes Regional Airport <br /> 5 miles-Breezy Point Airport <br /> 9 miles-Pine River Airport <br /> For more information on this or other communities,visit Minnesota Department of Employment and <br /> Economic Development's MNPro and search under"Community Profiles." <br /> Brainerd Lakes Area Development Corporation • Minnesota s 888-322-5232 or 218-828-0096 • email us <br /> Representing Crow Wing County and the communities of: <br /> Brainerd I Baxter I Breezy Point/Pequot Lakes I Crosby/Ironton/Deerwood I Crosslake/Emily/Manhattan Beach I Nisswa <br /> http://bladc.org/bldg/pub/pl/index.htm 1/3/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.