Laserfiche WebLink
STAFF REPORT <br /> Item: Extractive Uses and Restoration Ordinance <br /> Background: At the most recent City Council meeting, the City adopted the Planning <br /> Commission's recommendation for the Extractive Use Overlay District.At the last meeting, the <br /> Planning Commission indicated that these were the areas that were deemed most appropriate <br /> for this type of use, but elected to review the section of the Ordinance directly governing the <br /> operation and rehabilitation of Extractive Uses within the City. <br /> Ordinance Amendment Proposal: Based on previous discussions, the Staff proposes the <br /> following amendments to Section 8.5 governing Extractive Uses and Restoration(additions are <br /> underlined,deletions are stricken): <br /> 1. In all districts where permitted,as defined in Section 6.4 Extractive Use Overlay District, <br /> mining shall be permitted only by CUP. Such permit shall include as a condition: site <br /> plan, a completion plan, and a haul route plan with provision for road restoration as <br /> provide below. <br /> 2. All excavation and extraction shall conform to the following: <br /> A. Distance from property lines. No quarrying operation shall be carried on or any <br /> stock pile placed closer than 50 feet from any property line, unless a greater <br /> distance is specified by the CUP where such is deemed necessary for the <br /> protection of adjacent property„ pr-e-A ^a that +This distance requirement may <br /> be reduced to 25 feet only with written consent of the owners of the affected <br /> adjacent non-residence property. Proof of said agreement shall be submitted as a <br /> part of the application and maintained in City files for all approved CUPs for <br /> extractive uses.Without such agreement,the buffer area may be used only under <br /> the following circumstances: <br /> i. The bugger area may contain the haul road if the City determines that,for <br /> safgV purposes,the access to the use is best served in that area. <br /> ii. The haul road may be located in the buffer area to avoid wetlands or other <br /> sensitive environmental resources. <br /> iii. If authorized in an approved reclamation plan, one half of the buffer area <br /> may be used for the storage of topsoil and for final sloping. All topsoil <br /> storage areas shall be seeded to prevent erosion and dust. Berms, <br /> including those consisting of topsoil to be used for reclamation, may be <br /> placed in the buffer area, but they shall be seeded and mulched in a <br /> manner that prevents dust from blo-Mng onto adjacent properties. <br /> B. Distance from public right-of-way. In the event that the site of mining or <br /> quarrying operation is adjacent to the right-of-way of any public street or road, <br /> no part of such operation shall take place closer than 50 feet to the nearest line of <br /> such right-of-way. <br /> C. Fencing. Fencing shall be erected and maintained around the entire site or <br /> excavated portions thereof and shall be of a type specified in the CUP. <br /> D. Equipment. All equipment and machinery shall be operated and maintained in <br /> such a manner as to minimize dust, noise, and vibration. Power drives or power <br /> producing machinery,not including vehicles,shall not be housed or operated less <br /> than 1,000 feet from a residential use district. <br /> E. Processing. Crushing, washing, and refining or other similar processing may be <br /> authorized by the CUP as accessory use, provided, however, that such accessory <br /> processing shall not be in conflict with the use regulations of the district in which <br /> �. the operation is located. Processing shall not be permitted in the residential <br /> City of Pequot Lakes Staff Report 10-1 <br /> December 14,2oo6 <br />