Laserfiche WebLink
i <br /> i <br /> October 12, 2007 WIDSETH i <br /> SMITH <br /> N]OLTING <br /> Mr. Carl J. Smith, Jr. <br /> Car-Col Construction and Trailside Estates, LLLP <br /> 19513 State Highway No. 371 <br /> i <br /> Brainerd, MN 56401 VIA Email and Mail <br /> Re: Pequot Lakes, MN <br /> Trailside Estates <br /> WSN No. 0130B0034 <br /> Dear Mr. Smith: <br /> We are in receipt of Landecker's October 11, 2007 letter to you concerning the punch list, <br /> estimated value of remaining work, and a recommendation that your project bond/financial <br /> security be reduced to $33,750. t <br /> We concur with Landecker's letter. While the City Council has the final say, I would suggest you <br /> submit a bond/financial security for the$33,750 to the City so that all is in order the next time <br /> the City Council can take up this matter. After the City Council approves this reduction, the City <br /> should be able to release your larger, overall project bond and keep this smaller bond/financial <br /> security. <br /> While some are finished, not all of the remaining punch list items are completed - some you are <br /> still working on, several will not be able to be checked until next spring, and a couple you said <br /> you would not do(Item 1, Nos. 2 and 3). For the items that you said you would not take care of, <br /> we are disappointed that you took that approach— No. 2 is a standard that was part of your <br /> Engineer's certification of the plans and a requirement of yours and the City's Sanitary Sewer <br /> Extension Permit from the Minnesota Pollution Control Agency. If you do not take care of this <br /> responsibility, we will have to consider pursuing other avenues to address it. <br /> As several items will not be ready for final inspection until spring, we are recommending the <br /> following levels of acceptance to the public infrastructure improvements: <br /> Sanitary Sewer System 3 <br /> The City will run and perform normal maintenance on the lift station. You will be responsible for <br /> the manholes and pipe upstream of the lift station as well as any lift station repairs caused by <br /> material from the gravity system or your construction until overall acceptance by the City in the <br /> spring. <br /> i <br /> t <br /> Watermain System <br /> The City will, obviously, will continue to provide you with water. You will be responsible for the <br /> watermain, valves, curb stops, and other components of the system until overall acceptance by <br /> the City in the spring. <br /> f <br /> Storm Sewer System and Streets <br /> My understanding with City staff is that, while they are not committing, they are open to having <br /> discussions about doing the plowing of the streets over this coming winter. You will be <br /> I <br /> J:\0130B-City of Pequot lakes\013080034-Trailside Estates\0130B0034.000-Construction Services\Correspondence\101207-Car-Col-punch list and <br /> c ompletion.doc <br /> 7804 Industrial Pork Road ■ PO Box 2720 ■ Baxter,MN 56425-2720 ■ TEL:218.829.51 17 ■ FAX: 218.829.2517 ■ WEB:www.wsn-mn.com <br /> ENGINEERING ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES <br /> AA/EEO <br /> 1 <br />