CITY OF PEQUOT LAKES <br /> MONTHLY WATER/WASTEWATER REPORT <br /> October 2007 <br /> Prepared by: Tina Nolden(Water/WW Manager) <br /> WATER PLANT: <br /> All is working well at the water plant. <br /> WATER DISTRIBUTION: <br /> The gate valve at Whalen Woods has finally been replaced. Everything went well <br /> with that. Tom's Backhoe did a great job. The water was only off for an hour and a half, <br /> from 4:00 am to about 5:30 am. I didn't hear of any complaints. Chris,with Anderson <br /> Brothers,took care of the patching once the rain let up. <br /> WASTEWATER: <br /> Had to replace pump#1 at the Main Lift Station. Larry,with Electric Pump <br /> Company, installed the new pump on Oct. 23`d. The old pump had blown a seal and oil <br /> had gotten into many components and ruined them. The damage was too much to bother <br /> repairing. The new pump is working great. <br /> Lance and I have completed jetting the city sewer mains. It's a total of <br /> approximately 6 miles of sewer line. We started Oct. I&and finished on Oct. 29th. We <br /> did it all in 12 days,not bad! Overall, it went quite well. We had just a few problem <br /> areas. Those areas we jetted two or three times and also added root killer/enzymes. <br /> Having done all that,hopefully we won't have any problems this winter. <br /> Our irrigation system has been winterized as well. Kurt and Lance helped with <br /> that. They drained all water from the gearboxes and removed the drain plugs. They also <br /> drained the main valve. I disconnected all the small lines to drain. The ponds are ready <br /> for winter storage. Lance and I cleaned the aeration lines on Oct. 15th. <br />