Laserfiche WebLink
Maintenance Department Monthly Report <br /> October 2007 <br /> A couple of thunderstorms with heavy rain and high winds have created <br /> problems this month. With the completion of street projects with no grass <br /> ground cover up, some wash outs of ditches and retention ponds have <br /> happened more than once. The large drainage area on Gravdahl Drive was <br /> lowered two more feet to handle more water run-off. Dozens of damaged <br /> trees have been removed from streets and right-of-ways and hauled away. <br /> All of the playground equipment for Trailside Estates has arrived. Like <br /> large jigsaw puzzles, they are being assembled and readied for installation <br /> by the end of the month. <br /> With the installation of carpet, base trim in the kitchen and touch-up <br /> staining, the improvements to the Cole building project will be completed <br /> and finalized. There will be an open house on Oct. 6`'' <br /> Meetings attended in September <br /> Sept. 9 — 10 MMUA safety meeting in Pint River <br /> Sept 13 Monthly Department budget meeting <br /> Sept 13 Park Board meeting <br /> Sept 20 Job evaluation committee meeting <br /> Sept 24 Economic Development meeting <br />