Maintenance Department Monthly Report <br /> September 2007 <br /> With some minor wash out repairs from heavy rain and a few alterations on <br /> the retention pond design, the street projects are now at the substantial <br /> completion stage with only a small number of them to be finished. <br /> The Cole Memorial building floor was refinished by a contractor recently <br /> and looks very nice. The Maintenance Department installed the bathroom <br /> fixtures, refurbished the theater seats and re-hung the large mural in the <br /> meeting room. An inspection of the building by the League of MN Cities <br /> Insurance loss control agent is scheduled, and when complete, will end the <br /> work that was to be finished by the City in 2007. <br /> All of the playground equipment for Trailside North Park has arrived and <br /> should be installed by the end of September to complete construction in that <br /> park. <br /> Meetings attended in July: <br /> Aug 3 Building Committee meeting <br /> Aug 6 Water plant— colored water meeting <br /> Aug 7 Joint Planning & Zoning and Council meeting <br /> Aug 7 Right-of-way questions on Oriole Street <br /> Aug 7 City Council meeting <br /> Aug 8 Job Evaluation Committee meeting <br /> Aug 9 Park Board meeting <br /> Aug 9 City Safety Committee meeting <br /> Aug 9 Staff meeting <br /> Aug 14 City Council Budget workshop <br /> Aug 15 Monthly Department Budget meeting <br /> Aug 20 Hearing test from MMUA <br /> Aug 20 MMUA safety training in Nisswa <br /> Aug 22 League of MN building appraisal <br /> Aug 29 Berkley Risk - Cole building inspection <br /> Aug 30 Capital improvements plan with WSN <br />