My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.03 - Trailside Estates Project Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2007
>
09-04-2007 Council Meeting
>
06.03 - Trailside Estates Project Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 3:25:41 PM
Creation date
6/24/2016 3:25:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FROM CAR COL SEWER SERVICE FAX NO. 218 828 8833 Aug. 30 2007 03:02PM P2 <br /> !side 'Estates <br /> 19513 State Hwy 371 <br /> Brahmd, RN 56401 <br /> August 29, 2007 <br /> City of Pequot Lakes <br /> Attn. Sandy Peine- City Clerk <br /> 4638 County Road #11 <br /> Pcquot Lakes, MN 56472 <br /> RE: Developer's Agreement and Punch List- Trailside Estates <br /> Itenz 1 - Televising gfsanitary sewer mains; <br /> Could not be completed on August 28 and is rescheduled for Tuesday, September 4, <br /> 2007. They should have it to us by the end of next week. <br /> Item 3 - Construct ditching around the northwest cul-de-sac (station 0+00 to 0+60); <br /> Need to be discussed with the city. <br /> Item 4- Construct by-pass lane on Count),Road#112; <br /> 'Me by-pass lane has been paved. I spoke with Lynn at Minnesota Power. Their <br /> engineer was matting with the county today to decide what should be done about moving <br /> the two power poles. i have also called Eric from LineScape to std.pe the by-pass lane, <br /> but they haven't given me a date yot. <br /> Item S- Remove and replace cracked concrete curb and gutter at the hollowing locations: <br /> ..Trailside Road- 1+25 left., 2+25 right, 4+50 right, 7+15 right, 9+25 right, 9+70 right. <br /> Trailside Loop - 4+25 right, 5+15 right, S+24 right, 5+31 right, 6+00 right, 7+15 left. <br /> Need to be discussed with the city. <br /> Item 6- Remove and replace 15 feet of concrete curb and gutter north of CB 4, station 5+09 to <br /> 5+24 left to provide positive drainage tot he catch basin_ <br /> Need to be discussed with the city <br /> Item 8- At the East End(upstream end) of the culvert at Trailside Loop station 0+28: install <br /> 15"GS pipe apron and remove sediment from constructed sump area. <br /> The sediment was cleaned again, but the turf needs to establish itself, also needs to be <br /> discussed with the city, <br /> Item 11 - Construct rip-rap channel ai station 10+001efl. Bituminous spillway appears to slope <br /> to the roadwav; contractor shall verify positive drainage when constructing the spillway. <br /> The rip-rap channel has been installed and the topsoil has been removed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.