Laserfiche WebLink
05/30/2007 10: 23 2188297607 ANDERSON BROTHERS PAGE 01 <br /> aHmit" Anderson Brothers Construction Company <br /> BROTH M P.O. Box 668 <br /> Brainerd, MN 56401 <br /> 218-829-1768 •Fax 218-829-7607 <br /> w <br /> Building Our CommuNides Since 1940 <br /> An Equal Oppormnity Employer <br /> May 30`h,2007 <br /> City of Pequot Lakes <br /> Attn: Mike <br /> P.O. Box 361 <br /> Pequot Lakes MN 56472 <br /> RE: Pequot Boulevard and Honey Suckle Street <br /> We are pleased to quote the following on the above-referenced project. <br /> Price Includes: <br /> Hr -, Sy uckle Street <br /> �.. Shape existing Class 5 gravel on Honey Suckle Street. ` <br /> 2. 2"compacted bituminous wear course 13' wide covering 615 LF. <br /> 3. Approx 230' LF of bituminous gutter. <br /> 4. 2' wide topsoil shoulder <br /> Peauot Boulevard <br /> 5. Sawcut ends of existing bituminous pavement and remove 377 sy of existing bituminous pavement. <br /> 6. Move existing roadway approx 10' to the west and raise the grade of existing roadway to ensure pamper <br /> drainage. <br /> 7. Install structure and casting <br /> S. Install approx 75' LF of RCP culvert and 1 apron. <br /> 9. 4"compacted Class 5 gravel covering 170'x24' wide <br /> 10. The construction of 2"compacted bituminous wear course 20' wide covering 170 LF. <br /> 11. Construct bituminous spillway from end of bituminous gutter to retention pond <br /> 12. Remove 2 trees and brush,and construct retention pond approx 50x2Ox4' deep <br /> 13. Place erosion control blanket around top edge of retention pond <br /> 14. Construct overflow with rip rap and fabric on end of retention pond <br /> PRICE $219933.01 <br /> If you have any questions,please call. <br /> Sincerely, <br /> Al Knowlen <br /> Division Manager <br />