My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.03 - Proposal from Jon Commers - Economic Impact Study of Hwy 371
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2007
>
05-01-2007 Council Meeting
>
10.03 - Proposal from Jon Commers - Economic Impact Study of Hwy 371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 9:21:14 AM
Creation date
6/24/2016 9:21:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proposal to City of Pequot Lakes,Minnesota,Alternate Route Study Group <br /> April 13,2007 <br /> Page 3 of 6 <br /> alignment"in the draft EIS) will begin with collecting an inventory of the data listed <br /> above, and viewing it through the lens of the existing zoning and the zoning in place <br /> or planned for the realigned corridor. The core of the analysis will use parcel-specific <br /> data for all property within the two study areas (the boundaries of which can be <br /> determined together in the first phase of the work), and work with the Community <br /> Growth Institute to categorize property into three general uses: <br /> •Enterprises highly sensitive to traffic volumes; <br /> •Businesses less sensitive to traffic volumes but more sensitive to ease of access;and <br /> •Businesses sensitive both to traffic volumes and ease of access. <br /> A body of research exists on which types of uses generally fit each of these profiles, <br /> and our work will include analysis (as applicable) using the same methods for the <br /> existing corridor and the realigned corridor east of downtown. Using varying levels of <br /> changes in traffic volumes,I will prepare a range of potential impact on estimated <br /> market values for parcels in the study area. I will also examine the impact of land <br /> takings envisioned in the draft EIS or as otherwise envisioned by the City, and factor <br /> in these financial effects into the analysis. <br /> The use of geographic information systems (GIS) will be used both to aid the analytics <br /> as well as convey results. I have spoken with Mr. Marohn from Community Growth <br /> Institute,who has indicated that the Institute is able and willing to provide GIS <br /> support for this purpose. <br /> The analysis described here will yield feedback regarding: <br /> •Projected impact on estimated market values associated with changes in traffic volumes for <br /> the existing corridor and the realignment corridor; <br /> •Projected impact on estimated market values associated with the two development scenarios <br /> discussed versus the current situation; <br /> •The impact on the net tax capacity in the City indicated by the above results,using City <br /> zoning documents as a guide regarding the land uses planned for areas along the realignment <br /> corridor and the existing corridor; <br /> •A comparison of the change in the City's net tax capacity projected to result from <br /> realignment and expansion in the current alignment,to corresponding City costs. <br /> I are also prepared to work with the City to structure an approach for a public role in <br /> stabilizing existing businesses either during a construction period to expand the <br /> existing alignment, or during a shifting of traffic volumes to a realigned highway. <br /> Proposed Budget Expectations <br /> Based on the summary included above,the budget proposed for this project is$12,070, <br /> which is itemized within the project in the table below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.