Laserfiche WebLink
CITY OF PEQUOT LAKES <br /> MONTHLY WATER/WASTEWATER REPORT <br /> APRIL 2007 <br /> `.. Prepared by: Tina Nolden(Water/WW Manager) <br /> WATERPLANT: <br /> All is working well at the Plant. I had Eric with Larsco Co. come up on April 23rd <br /> to rebuild the rotometer on one of our Chlorine cylinders. It needed a new diaphragm and <br /> some o-rings. I was able to watch while he worked on it,so next time I can take care of it <br /> myself. I just need to get the spare parts. I'm working on our Vulnerability Assessment <br /> for the Plant and it's almost complete. April 1611,Mike and Kurt helped seal a few cracks <br /> that were in the roof of the Water Plant. I haven't noticed any more leaks now. <br /> WATER DISTRIBUTION: <br /> I attended a class at SCTC on fire hydrants and water meters on April 2'4 and P. <br /> I learned how to maintain and repair hydrants and meters. It was a very informative class. <br /> It's also a good way to get to know others in the water/wastewater field and get some <br /> good advice. I'm working on getting extensions on curb-boxes so I can have an easier <br /> time turning customers' water on/off. April 191',Tom's Backhoe installed a meter pit at <br /> Tom Staley's Apartment Building on Olson Street. We were having troubles with <br /> delinquent accounts and felt his apartment bldg. should be like all the others in town so <br /> that their billing isn't so difficult and time consuming. I also discovered on April 161i that <br /> we have the same issues with the Wooddale Apt. Bldgs.on Rae Ave. For many years <br /> now they have only been metering two units when they have eight, four in each bldg. <br /> Jeanyne found this error while doing a history report. Two different months there was no <br /> usage at either bldg. Only two units were vacant at those times. The other six just weren't <br /> being metered. Since our discovery,we are now charging the unmetered rate for two, <br /> four-unit apt.bldgs. Eventually,these will also need meter pits installed to account for all <br /> water being used.Jeanyne has been putting in a lot of time and effort in getting all of the <br /> water/sewer billing issues resolved. Some day soon everything will go very smoothly. <br /> WASTEWATER: <br /> April 5"', Lance and I flushed MH#'s 43, 73 and 22. 1 added root killer to#73 and <br /> enzymes to#22. These are low-flow,problem areas that just need a little extra attention. <br /> April 9h, I had Infratech clean three of our lift stations. Two of them had terrible grease <br /> build-up and the one at Industrial Park needed some sand and rock sucked out.Now I <br /> have a fresh start and can keep them maintained. I attended an MWOA meeting in <br /> Paynesville on April I01i. This helps keep my wastewater license updated. I'm working <br /> with Electric Pump on getting two more Omni-Site Alarms on our lift stations. We need <br /> to have these in order to continue with our"No-Fault Sewer Back-Up Coverage." <br /> OTHER: <br /> April 19"', I sold our lawn mower! Tom Jensen with Rothsay School District <br /> purchased it for$4,950.00.This money will be put back into our water/sewer budget. <br />