Laserfiche WebLink
Maintenance Department Monthly Report <br /> January 2007 <br /> Because of a computer failure on the sterling plow truck, the recent purchase of a plow <br /> for the Sewer department truck came in very important during last weeks snowfall. <br /> The second of a three years worth of budgeted 911 signs have been ordered and will be <br /> installed when the ground thaws. Also, a plan for replacing all current street name signs <br /> with the required six inch signs has been started. They will be replaced over a four year <br /> period. <br /> The Maintenance Department has started to look into the possibility of changing the <br /> entire lighting system for the shop and garage areas of the City Hall building. Through <br /> energy assessment,budgeting and a rebate program through the power company, we hope <br /> to propose it in the 2008 building budget. <br /> Meetings attended in January: <br /> Jan 2 - Council meeting <br /> Jan 3 - Wastewater contract with Pine River <br /> Jan 4 - City safety meeting <br /> Jan 5 - Job evaluation committee <br /> Jan 5 - Apartment owners water meeting <br /> Jan 18 - Group MMUA safety meeting in Lakeshore <br /> Jan 8 - Irrigation lease contract <br /> Jan 9 - Job evaluation committee <br /> Jan 9 - WSN 2007 road projects with liaison <br /> Jan 11 - Park Board meeting <br /> Jan 12 - MPCA meeting in Baxter <br /> Jan 16 - Building inspector at Cole building <br /> Jan 17 - OSHA in Grand Rapids <br /> Jan 18 - Roadway work safety zones meeting in Baxter <br /> Jan 22 - Elevator company and contractors at Cole building <br />