Laserfiche WebLink
NOR-S O IV z 0 " <br /> Construction Services <br /> Richard and Lori Westlund April 24th, 2006 <br /> 8016 Ski Chalet Drive <br /> Breezy Point, MN 56472 <br /> RE: Storm Water Agreement <br /> Rich and Lori: <br /> You left a voice mail for me on Friday, April 7th regarding your concern on the pricing for the storm water <br /> system. I had a chance to discuss the pricing with Scott Mudgett from Anderson Brothers. The original <br /> quoted cost for the storm water system of$8,450 did include 100 cubic yards of fill. The fill material <br /> totaling$1,355 was used to correct drainage on the north side of the Firehall building. The fill cost of <br /> $1,355 is not part of the joint storm water drainage structure installation. <br /> Original storm water system cost: $8,450.00 <br /> Deduct fill material: <$1,355.00> <br /> Revised storm water system cost for <br /> drainage structures #6 and#7: $7,095.00 <br /> Total cost to Westlund's: $3,547.50 <br /> Total cost to Sutton's: $3,547.50 (plus $1,355 of fill material) <br /> The total storm water system costs include: Large tree and stump removal, 15" HDPE storm sewer <br /> piping,two Nyoplast drainage structures, connection to the City storm water system under Government <br /> Drive. Note: Connections to the City system are dependent on the City of Pequot Lakes schedule for the <br /> improvements to Government Drive. <br /> There is a$1,300 balance owed to Anderson Brothers Construction for the final connections to <br /> Government Drive. That equates to a total due at this time of$2,897.50. ($3,547.50 minus one half of <br /> the$1,300 balance: $3,547.50-$650=$2,897.50) <br /> Please issue your payment of$2,897.50 to Nor-son Inc. The balance of$650 will be due once the final <br /> connections are made to the City storm water system. Please issue your payment to Nor-son and direct <br /> any questions that you may have to Nor-son, attention: Chad Rushin. <br /> The control of the storm water runoff is your responsibility. Mr. Sutton and Nor-son have extended ample <br /> opportunity for you to be a part of Drainage Structures#6 and#7 on Mr. Sutton's property. This is the <br /> last opportunity that will be offered to you. <br /> If you choose not to participate in the joint storm water effort described above, please feel free to contact <br /> the City of Pequot Lakes and Widseth Smith & Nolting to have your own system engineered, designed, <br /> and constructed to fit on your property. I'm guessing the engineering costs will be$2,000 to$3,000 on <br /> top of the costs to actually construct the system. <br /> Sind <br /> Chad F. Rushin <br /> Project Manager <br /> Nor-son Inc. <br /> cc: DaWn Bittner, Pequot Lakes P&Z <br /> Kermit Sutton <br /> Brooke Silvernail—Nor-son Inc. <br /> 7900 Hastings Road, Baxter, MN 56425 <br /> AN EQUAL OPPORTUNITY EMPLOYER•MN LIC.0OOO1969 <br />