My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5C - Conditional Use Permit for Crafter OUtlet Mall, Van Valkenburg
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2006
>
05-18-2006 Planning Commission Meeting
>
5C - Conditional Use Permit for Crafter OUtlet Mall, Van Valkenburg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2016 3:55:36 PM
Creation date
6/15/2016 3:55:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRAFTER OUTLET MALL <br /> SECTION 23, TOWNSHIP 136 NORTH, RANGE 29 WEST <br /> CITY OF PEQUOT LAKES <br /> CROW WING COUNTY,MINNESOTA <br /> DISTURBED AREA=8.00 ACRES+/- <br /> IMPERVIOUS AREA=4.55 ACRES+/- <br /> Project Description Construction Requirements for the MPCA NPDES Storm Water Permit: <br /> THE PROJECT CONSISTS OF THE CONSTRUCTION OF TWO RETAIL 1)THIS PLAN SET SERVES AS THE'STORM WATER POLLUTION PREVENTION PLAN' <br /> BU ILDINGS,ONE STORAGE BUILDING,PARKING LOT,AND ACCESS <br /> DRVE.THIS PROJECT ALSO INCLUDES THE CONSTRUCTION OF THREE 2)TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES SHOWN IN THIS PLAN ARE FOR SUGGESTED <br /> INFILTRATION BASINS LOCATIONS.THE ENGINEER/OWNER,DURING THE TIME OF CONSTRUCTION,MAY ADJUST THESE LOCATIONS TO <br /> Project Maintenance BEST SUIT THE PROJECT CONDITIONS,THIS DOES NOT HOWEVER,RELIEVE THE CONTRACTOR OF THEIR <br /> RESPONSIBILITIES AS SET FORTH IN THE MnDOT SPECIFICATIONS AND MPCA NPDES STORM WATER PERMIT FOR <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING, CONSTRUCTION ACTIVITY. <br /> INSPECTING AND MAINTAINING THE EROSION AND SEDIMENT CONTROL <br /> BMP'S DURING CONSTRUCTION.THE OWNER SHALL BE RESPONSIBLE 3)ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES SHALL BE IN PLACE PRIOR TO BEGINNING ANY <br /> FOR THE LONG TERM OPERATION AND MAINTENANCE OF THE UPGRAMENT CONSTRUCTION ACTIVITIES,EROSION AND SEDIMENT CONTROL DEVICES SHALL BE MONITORED AND <br /> PERMANENT STORM WATER MANAGEMENT SYSTEM. MAINTAINED BY THE CONTRACTOR UNTIL FINAL TURF COVER HAS BEEN ESTABLISHED AND ACCEPTED BY THE <br /> OWNER. <br /> Project Soils 4)ALL EXPOSED SOIL AREAS THAT ARE NOT ACTIVELY BEING WORKED MUST HAVE TEMPORARY EROSION <br /> According to the Crow Wing County Soil Survey the project PROTECTION OR PERMANENT COVER WITHIN THE FOLLOWING TIME FRAMES: <br /> TYPE OF SLOPE TIME <br /> soils consist of Chetek-Onamis Association(COA). STEEPER THAN 1:3 7 DAYS <br /> 1:10 TO 1:3 14 DAYS <br /> FLATTER THAN 1:10 21 DAYS <br /> MPCA NPDES Storm Water Requirements <br /> 5)ALL DISTURBED AREAS SHALL RECEIVE A MINIMUM OF 3'OF TOPSOIL,MNDOT SEED MIXTURE 260 AT A RATE OF <br /> Total Impervious Area=4.55 Acres 120 LBS/ACRE'COMMERCIAL FERTILIZER ANALYSIS 23.0-30 AT A RATE OF 200 LBS/ACRE,MULCH MATERIAL TYPE 1 <br /> AT A RATE OF 2 TONS/ACRE,AND DISK ANCHORED, <br /> 6)THE CONTRACTOR SHALL BE RESPONSIBLE TO IMPLEMENT THE EROSION AND SEDIMENT CONTROL MEASURES <br /> AS INDICATED IN THIS PLAN AND MINNESOTA POLLUTION CONTROL AGENCY PERMIT NUMBER MN R100001. <br /> MPCA Required Storage-Infiltration Basins 7)THE CONTRACTOR SHALL CONDUCT INSPECTIONS AND KEEP RECORDS OF THOSE INSPECTIONS.INSPECTIONS <br /> 112"Runoff over Impervious Area SHALL BE MADE WITHIN 24 HOURS OF ANY RAINFALL EVENT,DURING NON-FROZEN GROUND CONDITIONS, <br /> 1/2"x4.55 Acres INSPECTIONS SHALL BE MADE AT LEAST ONCE A WEEK. <br /> MPCA Required Slorage=0.19 Acre-Ft 8)THE CONTRACTOR SHALL INSTALL A RAIN GAUGE ON-SITE, <br /> B)THE CONTRACTOR'S RECORDS SHALL INCLUDE THE FOLLOWING: <br /> Infiltration Basins A.DATE AND TIME OF INSPECTIONS. <br /> B.FINDINGS OF INSPECTIONS. <br /> Total Storage Provided=1.05 Acre-Ft C.CORRECTIVE ACTIONS TAKEN(INCLUDING DATES AND TIMES). <br /> D.DOCUMENTATION OF THE CHANGES TO THE STORM WATER AND EROSION CONTROL PLAN MADE DURING <br /> CONSTRUCTION. <br /> E.DATES AND AMOUNTS OF PRECIPITATION, <br /> CONSTRUCTION NOTES: 10)THE CONTRACTOR SHALL POST THE'NOTICE OF STORM WATER PERMIT COVERAGE'CARD AT THE <br /> CONSTRUCTION SITE ENTRANCE AT A LOCATION VISIBLE FROM THE NEAREST PUBLIC ROADWAY. <br /> 1.)ALL CONSTRUCTION SHALL CONFORM TO THE 2005 EDITION OF THE 11)THE CONTRACTOR SHALL SUBMIT A'NOTICE OF TERMINATION-WITHIN 30 DAYS AFTER CONSTRUCTION IS <br /> MINNESOTA DEPARTMENT OF TRANSPORTATION'S"STANDARD COMPLETE AND THE SITE HAS UNDERGONE FINAL STABILIZATION TO THE: <br /> SPECIFICATIONS FOR CONSTRUCTION" MINNESOTA POLLUTION CONTROL AGENCY <br /> WATER QUALITY DIVISION <br /> 2.)BEST MANAGEMENT PRACTICES(BMP)IN ACCORDANCE WITH THE 500 LAFAYETTE ROAD NORTH <br /> MINNESOTA POLLUTION CONTROL AGENCY'S"PROTECTING WATER ST.PAUL,MN 55155-4194 <br /> QUALITY IN URBAN AREAS"SHALL APPLY <br /> 12)ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES MUST BE REMOVED BY THE CONTRACTOR WHEN <br /> 3.)VERIFY LOCATION OF ALL UNDERGROUND UTILITIES,CONTACT FINAL TURF COVER HAS BEEN ESTABLISHED AND ACCEPTED BY THE OWNER. <br /> UTILITY COMPANIES PRIOR TO CONSTRUCTION."GOPHER-ONE-CALL" <br /> 131 THE CONTRACTOR SHALL RESPONSIBLE FOR DISPOSING ALL SOLID WASTE:COLLECTED SEDIMENT, <br /> TELEPHONE 1-800.252-1166 <br /> ASPHALT AND CONCRETE MILLINGS.FLOATING DEBRIS,PAPER,PLASTIC,FABRIC CONSTRUCTION AND DEMOLITION <br /> DEBRIS AND OTHER WASTES MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL <br /> REQUIREMENTS. <br /> 14)THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HAZARDOUS MATERIALS DURING CONSTRUCTION:OIL, <br /> GASOLINE,PAINT AND ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED,INCLUDING SECONDARY <br /> CONTAINMENT,TO PREVENT SPILLS,LEAKS OR OTHER DISCHARGE.RESTRICTED ACCESS TO STORAGE AREAS <br /> MUST BE PROVIDED TO PREVENT VANDALISM,STORAGE AND DISPOSAL OF HAZARDOUS WASTE MUST BE IN <br /> COMPLIANCE WITH MPCA REGULATIONS. <br /> 15)EXTERNAL WASHING OF TRUCKS AND OTHER CONSTRUCTION VEHICLES IS PROHIBITED ON THIS PROJECT SITE. <br /> CONCRETE TRUCKS MAY WASH THEIR CHUTES AT A CONTROLLED LOCATION.EXCESS CONCRETE MATERIAL MUST <br /> BE REMOVED FROM THE PROJECT SITE PRIOR TO COMPLETION. <br /> POST LENGTH, 5 FT. MI 16)THE PROJECT SHALL INCLUDE A CONSTRUCTION ENTRANCE ONTO COUNTY ROAD#107.ONCE THE APPROACH <br /> AT 6 FT. MAX. SPACING IS CONSTRUCTED,THE CONTRACTOR SHALL PLACE 6 INCHES OF 1 INCH TO 21NCH CRUSHED ROCK ALONG THE <br /> PROPOSED ROAD BED TO A MINIMUM OF 50 FEET FROM THE EDGE OF HAZELWOOD DRIVE,UPON THE COMPLETION <br /> PVSTIC ZIP TIES OF THE EXCAVATION THE CONTRACTOR SHALL REMOVE/SALVAGE THE ENTRANCE MATERIAL AND PLACE THE <br /> (50 LB. TENSILE PLANNED GRAVEL BASE MATERIAL. <br /> LOCATED IN TOP 8" <br /> GEOTExTiIE FABRIC, 17)CONSTRUCTION SITE VEHICLE EXIT LOCATIONS SHALL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT <br /> DIRECTION OF 36'WIDTH TRACKING ONTO PAVED SURFACES.TRACKED SEDIMENT MUST BE REMOVED FROM ALL OFF-SITE PAVED <br /> RUNOFF FLOW SURFACES,WITHIN 24 HOURS OF DISCOVERY.STREET SWEEPING MUST BE USED IF BMPS ARE NOT ADEQUATE TO <br /> �_�-- PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET, <br /> 18)THE PROJECT DOES NOT INCLUDE DE-WATERING. <br /> w MACHINE SLICE G <br /> ''o w 8"- 12" DEPTH <br /> (PLUS 6" FLAP) <br /> o <br /> TO PROTECT AREAS FROM SHEET FLOW <br /> (SEE SPEC. 3886) <br /> PUBLIC ROAD <br /> SILT FENCE DETAIL-MACHINE SLICED <br /> SCALE: -NONE>> <br /> RADIUS AS REQUIRED <br /> z <br /> 7 y 1 IN.MIN.DEPTH OF <br /> 1 IN u 2 IN. <br /> CRUSHED ROCK, <br /> UNLESS OTHERWISE <br /> DIRECTED <br /> ENTRANCE WIDTH <br /> /�. _ <br /> s...a [r °.rt,nu AS REQUIRED <br /> TYPICAL ACCESS DRIVE ROAD SECTION <br /> a"`E ROCK CONSTRUCTION ENTRANCE <br /> SCALE: c<NONE» <br /> ' STORMWATER POLLUTION PREVENTION PLAN °RO1-"1OP- G01°ptER oAtE' REWSIONSr rw gAsyronsa,o Landeckec 8c AssocinCes,Inc. <br /> GATE DESCRIPTION BY iXE SrnirafaessaSaTA axs a� E, <br /> w .CRAFTER OUTLET MALL PAT SP05105&<. 0!124/06 ♦[CES9 ROM aW <br /> ROB VANVALKENBURG rxasoar. soot ze. .il_ ���qsa ' ""VaO r Ilesee., <br /> rasp srx ��'VW� r.w" <br /> 14819 EDGEWOOD BGD sons rss Pc. <br /> BAXTER.MN 56425 - <br /> (218)83 1-0537 eoD c5rosa VERT <br />
The URL can be used to link to this page
Your browser does not support the video tag.