Laserfiche WebLink
17. The submitted rendering shows the concept for the proposed sign,but does not indicate <br /> total size of the structure. The proposed sign should not exceed 96 square feet in size <br /> \... (counting both sides),and 15 feet in height(Sec.7.1,Subd.5A(4b)). <br /> 18. The applicant has indicated the locations for the proposed exterior lights, with the <br /> majority of the lights located along the western sides of the proposed buildings. <br /> Planning Commission Direction: The Planning Commission can recommend approval of <br /> the conditional use permit, recommend denial, or table the request if additional information is <br /> needed. If the recommendation is for approval or denial,findings of fact should be cited. <br /> Staff Recommendation: If the Planning Commission allows for the use as proposed,and are <br /> prepared to approve the application,we recommend that consideration be given to the following <br /> conditions: <br /> 1. The applicant shall maintain existing vegetation along the properties boundaries. <br /> Pursuant to Section 5.io, Subdivision 4D, the applicant shall replace or supplement <br /> vegetation along the eastern property line (adjacent to the Paul Bunyan Trail) so as to <br /> provide at least 5o%screening of the property. <br /> 2. All winterization operations shall be performed within the confines of one of the <br /> structures.No winterization activities shall be performed outdoors. <br /> 3. To avoid adverse impacts resulting from winterization activities, the applicant shall <br /> obtain permits for the disposal of oils, antifreeze, and any other classified toxic wastes <br /> related to winterization from the MPCA and EPA prior to the commencement of <br /> winterization operations. Copies of these permits shall be forwarded to City Hall, and all <br /> accompanying conditions shall be followed. <br /> 4. All vehicles to be winterized shall not be stored outdoors for more than seven (7) <br /> consecutive days. <br /> City of Pequot Lakes Staff Report 4-5 <br /> May 18,20o6 <br />