My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C - Downtown Plan Review
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2007
>
12-13-2007 Planning Commission Meeting
>
6C - Downtown Plan Review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2016 10:33:04 AM
Creation date
6/15/2016 10:33:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Executive Summary <br /> L While Minnesota's Central Lakes Region is experiencing unprecedented levels of growth <br /> and development, a number of communities in the region are following national trends <br /> and seeking to revitalize,or in some instances recreate,their historic downtowns. These <br /> efforts have varying advantages and disadvantages. <br /> Developers in the City of Baxter are attempting to build an auto-oriented "downtown" <br /> amongst the big-box retail that defines the city. Coalitions are forming in Brainerd to <br /> focus efforts on revitalizing that has suffered from years of deterioration. Nisswa, its <br /> popular historic downtown limited by surrounding development, is considering <br /> establishing a new and separate downtown area that would resemble Baxter's model in <br /> design. Crosslake, borrowing a page from the New Urbanist movement, is working to <br /> establish a center town square in a community that has no natural center. <br /> Only Pequot Lakes has the combination of desire and the ease of opportunity to turn <br /> dreams of a destination downtown into reality. The existing Pequot Lakes downtown, <br /> centered on the former railroad stop,has the natural pattern of the historic downtown. <br /> A stable base of quality businesses provides the anchor from which growth can build. <br /> There is ample room for expansion, which can be supported year-round by the <br /> residential neighborhoods within walking distance. Pending highway improvements <br /> will make Pequot Lakes even more accessible to the area. The trail park is a largely <br /> untapped amenity that few downtowns can provide. The advantages all of this gives <br /> Pequot Lakes are enormous. <br /> The cost of the downtown improvements proposed in this report, though daunting, <br /> should not be an obstacle.' Much of the roughly$A.c�million needed to fully implement 6.6 <br /> the plan includes street improvements that are necessary regardless of the City's <br /> approach to the downtown. The ability to identify and make value-added improvements <br /> during what would otherwise be maintenance projects gives the City an opportunity to <br /> make wise and efficient spending decisions. <br /> While assessments are a necessary and key component of the overall funding and <br /> redevelopment strategies, other funding mechanisms will also be important. Tax <br /> increment financing and tax abatement are incentives that can be justified by the long- <br /> term economic and social value of a health downtown. Sales tax revenue particularly Deleted:if the present alignment is <br /> Y �P Y maintained,it is going to be critical <br /> that which is generated within the downtown,provides a mechanism to capture outside 1 that the entrance to Pequot lakes be <br /> money o fund an area-wide destination. Negotiations with Mn DOT and Crow Win well defined and that the destination <br /> Y g � g l experience,in both volume and <br /> County in the Highway 371 project, along with partnerships with the DNR, must all be quality of shops,is Strong enough to <br /> leveraged to implement the plan. draw expansion off the highway.with <br /> g P P / expansion along the current <br /> alignment,there will be a natural <br /> With debate continuing over the ultimate alignment of Highway 371, it is important to 1 temptation for the City to spend <br /> money on other critical highway- <br /> acknowledge that the establishment of a destination downtown is both critical to and related infrastructure improvements. <br /> completely independent of the ultimate decision on the highway. Letting the downtown go without a <br /> strong P Y P It will make it investment i in enhancements <br /> downtown to be expanded beyond its <br /> I .— — — - - - - - - — — - - — - - — — — — — — — — — — — — — — — — — — current mix of high-visibility <br /> offerings.9 <br /> Pequot Lakes Downtown Plan—Updated December 200 7 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.