Laserfiche WebLink
Pequot Lakes <br /> Hwy 371'Alternate Route <br /> Joint Committee of the City Council and Planning Commission <br /> June 5, 2007 <br /> Submitted by Tim Houle and Mike Rude, Widseth Smith Nolting <br /> According to the schedule of questions laid out earlier in this process, WSN/City <br /> Engineer was to answer five questions related to impacts to City infrastructure <br /> investments. Our comments on these five questions come from a broad <br /> engineering perspective as opposed to a finite, design-level analysis. <br /> The Committee may also want to hear from the City's Street Superintendent <br /> and WaterNVastewater Operator on these questions from maybe a more <br /> operational perspective. <br /> The Committee may also want to hear from its Planning Commission from a <br /> future planning and zoning perspective, as these are very much related to public <br /> works'/infrastructure (i.e. future plans/desires for the Business Park). <br /> For our input and answers below, please refer to the proposed alternate route <br /> indicated on the map on the wall in the City Council Chambers. <br /> What changes would need to be made to the local street system to <br /> accommodate an alternate route? <br /> Our answer to this question is based on the alternate route only having three at- <br /> grade intersections. One would be on the south in the area of Derksen Road and <br /> the existing TH 371. One would be at CSAH 11. One would be on the north to <br /> serve both CR 112 and the existing TH 371. <br /> Besides these three proposed intersections, the only other roads intersected by <br /> the alternate route are Derksen Road, Morehouse Drive, and Tree Farm Road; <br /> all south of CSAH 11. <br /> From roughly Derksen Road south to Nisswa, the changes to the local street <br /> system should be identical under either route. These would include the addition <br /> of City streets generally serving as service roads to the expanded TH 371. <br /> The alternate route is shown to cut through Derksen Road. MnDOT will need to <br /> make provisions to "reconnect"the east side, or dead-end side, of Derksen Road <br /> back to the rest of the City street system. In the Draft EIS stage, they showed a <br /> service road going southwest into the spray irrigation field and connecting to the <br /> southern intersection with the present TH 371. <br /> The alternate route will cut off the south end of the curb and guttered Morehouse <br /> Page I of 5 <br /> C:\Documents and Settings\dawnbTocal Settings\Temporary Internet Files\OLK I 3D\060507-Joint <br /> rniinnil and P7 Mr. <br />