My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9 - Minutes 011807
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2007
>
02-15-2007 Planning Commission Meeting
>
9 - Minutes 011807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 2:20:59 PM
Creation date
6/13/2016 2:20:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fencing or other means as approved by the City. Trails should not be <br /> constructed over the treatment areas. <br /> d. The City may wish to require a copy of the sewage pumping contract <br /> between the association and their pumper/maintenance contractor, and <br /> maintenance records on an annual or bi-annual basis. <br /> e. All piping/collection systems must meet the requirements of the <br /> Minnesota Plumbing Code, and include cleanouts at the required intervals, <br /> minimum slope, size of pipe,pipe materials, etc. <br /> The applicant has modified the sewage treatment system plans to provide for the <br /> Phase 2 treatment field to be relocated 20-feet from Lot and 10 feet from the <br /> top of the bluff.; <br /> 5. The applicant has not complied with all cond' ' s and requirements of <br /> preliminary approval. Outstanding concerns fro ;, ttorney remain. <br /> 6. The Final Plat has been prepared in agreement the p nary plat. <br /> 7. The title work has been provided and is b e i (r € e ed by 'ty Attorney. <br /> 8. There are no required improvernei ii therefore no fi security is <br /> necessary. 00"u/I <br /> 9. An independent land surveyor has conc ,tha �"€ final docur t meets the <br /> statutory requirements. <br /> subject to the following conditions: <br /> 1. Homeowner's association doc 'factory to y Attorney. <br /> .. is <br /> 2. Copies of all exhibits are attache ;o th tions„'- <br /> �. 3. The applicant shall concur to have' t tti din space lot, rezoned to Open <br /> r 001" <br /> Space consiste use and in ion of thy'of prior to the recording of the <br /> document. th <br /> All members vot ". Mot carried. <br /> Park Dedic brou arohn checked the Ordinance and stated <br /> that the <br /> fill RAN% s a mmendation to the Planning Commission. The Planning <br /> Co ion acts on lats; g Park Dedication. <br /> Mr. Pede as prepare dispute the recommendation of the Park Board for a Park <br /> Dedication $55,900 He asked if the City had a capital improvement budget on <br /> parks and open e. Wig ut one,there are no legal grounds to make a Park Dedication <br /> Fee. Staff stated as not qualified to answer this question. She would need to <br /> check with the City r <br /> ty k. Mr. Marohn stated that there is a trail plan included in the <br /> Comprehensive Plan. Demand for parks is driven by growth and development,thus the <br /> purpose of a Park Dedication Fee. <br /> Mr. Pederson passed out a handout. Previous plats with Park Dedication Fees were <br /> discussed. Staff was directed to re-evaluate the Park Dedication for Trailside Estates and <br /> bring back to the Planning Commission in February. <br /> L <br /> Planning Commission Minutes 3 <br /> January 18, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.