Laserfiche WebLink
Proposal to City of Pequot Lakes,Minnesota,Alternate Route Study Group <br /> March 30,2007 <br /> Page 3 of 6 <br /> or planned for the realigned corridor. The core of the analysis will use parcel-specific <br /> data for all property within the two study areas (the boundaries of which can be <br /> determined together in the first phase of the work), and work with the Community <br /> Growth Institute to categorize property into three general uses: <br /> •Enterprises highly sensitive to traffic volumes; <br /> •Businesses less sensitive to traffic volumes but more sensitive to ease of access;and <br /> •Businesses sensitive both to traffic volumes and ease of access. <br /> A body of research exists on which types of uses generally fit each of these profiles, <br /> and our work will include analysis (as applicable) using the same methods for the <br /> existing corridor and the realigned corridor east of downtown. Using varying levels of <br /> changes in traffic volumes,I will prepare a range of potential impact on estimated <br /> market values for parcels in the study area. 1 will also examine the impact of land <br /> takings envisioned in the draft EIS or as otherwise envisioned by the City, and factor <br /> in these financial effects into the analysis. <br /> The use of geographic information systems (GIS) will be used both to aid the analytics <br /> as well as convey results. I have spoken with Mr.Marohn from Community Growth <br /> Institute,who has indicated that the Institute is able and willing to provide GIS <br /> support for this purpose. <br /> The analysis described here will yield feedback regarding: <br /> •Projected impact on estimated market values associated with changes in traffic volumes for <br /> the existing corridor and the realignment corridor; <br /> •Projected impact on estimated market values associated with the fact that the realignment <br /> corridor will present different levels of access to businesses and developable sites than does the <br /> existing corridor; <br /> •The impact on the net tax capacity in the City indicated by the above results,using City <br /> zoning documents as a guide regarding the land uses planned for areas along the realignment <br /> corridor; <br /> •A comparison of the change in the City's net tax capacity projected to result from a <br /> realignment,to the anticipated City cost of constructing the realignment. <br /> We are also prepared to work with the City to structure an approach for a public role <br /> in stabilizing existing businesses either during a construction period to expand the <br /> existing alignment, or during a shifting of traffic volumes to a realigned highway. <br /> Proposed Budget Expectations <br /> Based on the summary included above,the budget proposed for this project is $8,580, <br /> which is itemized within the project in the table below. <br />