Laserfiche WebLink
PEQUOT LAKFs <br /> PLANNING AND ZONING COMMISSION <br /> MEETING MINUTES <br /> May 15, 20o8, at 6:30 PM <br /> 1. Call to Order—6:30 PM f <br /> 2. Roll Call: <br /> Planning Commission: <br /> PRESSENT: Mary Peterson, Scott Pederson, Mark Hallan Tom-* g, Tom Adams, Dean <br /> Williams, and Bill Habein. ABSENT: John Derksen. <br /> City Council Liaison: Craig Nagel. <br /> City Planner: Charles Marohn, PE. <br /> 3. Public Hearings—None. <br /> 4. Additions or Deletions to Agenda-None <br /> 5. Open Forum-None <br /> 6. New Business: <br /> a. Wilderness Point Resort Submittal items <br /> Mr. Marohn reviewed the process and the final plat,which isentatively scheduled for Junet%t <br /> Dave Reese, WSN, presents grading plan discion. He indicated that the number ofC rhits is <br /> decreasing,but the size is expanding from 1ox26�10 12x26. It falls into the same area and meets <br /> the buffer, but the number of units went down rdingly. This was desired by the owner to <br /> provide for better use of the units. <br /> Mr.Adams asked_how many total ultimately. Mr. Reese indicates that there will be 68. The end <br /> units will be divided ktwo to be smaller units. Originally there were 8o proposed. <br /> Mr. geese discussed &6-iage. He stated that flow is generally from the southwest to the <br /> north/northeast. There wig be some clearing for the access road, some of which does go into the <br /> buffer ayes The vegetationf,&n shows the replanting of trees there to reforest the area. There <br /> will be a culV- through there to maintain the drainage way. The runoff from the storage area <br /> will be contain within the storage area, which is large and exceeds the requirements for the <br /> storage area. The actualading will remove material and the units will be set down, partially <br /> obscured by the earfh The applicant is not opposed to planting additional vegetation, but the <br /> units will be lower th"e surrounding ground. <br /> Mr. Habein asked about stabilization on the back side of the units. Mr. Reese indicated that <br /> they are going to use a retaining wall. <br /> Discussion followed on drainage off of the building. Mr. Reese indicated that there will be a <br /> gravel liner on the edge of the building that will daylight at the north. <br /> Minutes 1 <br /> Pequot Lakes Planning Commission <br /> May 15,2oo8 <br />