Laserfiche WebLink
northeastern edge of the property will remain. An additional drainfield will be <br /> added on the northeastern side of the development. <br /> 35. The dwelling units are clustered on the southeastern portion of the property. <br /> Storage units are clustered on the western side of the property. The northern <br /> portion of the property is primarily wetland. No development is proposed in the <br /> wetland. <br /> 36. A beach and picnic area is located on the southern part of the western edge of the <br /> property. These areas have been consolidated into one area to reduce their overall <br /> impact. <br /> 37. The PUD is allowed up to 34 mooring sites; one site for each unit available in the <br /> first tier. The PUD is also allowed one day dock for loading and unloading for <br /> units beyond the first tier. The PUD exceeds the allowed number of mooring sites <br /> with a proposed 40 mooring sites. The existing CLAP for"the resort provides for 40 <br /> mooring sites. <br /> 38. The mooring sites are subject to location andcorifiguration as per consultation <br /> with the Department of Natural Resources. <br /> 39. A vegetation enhancement plan is currently in place, but will needo be updated <br /> as part of this proposal. <br /> Other <br /> 40. Middle Cullen Lake has 29, 416 Teet of shoreline, as per GIS data provided by <br /> Crow Wing County. Wilderness Resortias a total of 2,653 feet of shoreline. The <br /> resort comprises 9.0% of the total'shoreline 6n xhe lake. <br /> �., 41. Each unit is required to have 1.5 parking spaces,,which is identified on the site <br /> plan. <br /> 42. The survey does not indicate where any signage will be placed. Signage will <br /> require a separate permit, <br /> subject to theftillowing Conditions: <br /> 1. All previous Conditional Use Permits on this property are superseded by this <br /> permit. All previous CUP's are null and void. <br /> 2. Prior#on submission of a final plat application,the following shall occur: <br /> a. ale applicant shall submit a stormwater management/erosion control plan <br /> that handles�the 100-year, 24-hour storm event in perpetuity. <br /> b. The"stor mWater management/erosion control plan shall be reviewed by the <br /> Planning Commission. The plan will be revised as directed by the <br /> Planning Commission. <br /> c. Following review and revision as directed by the Planning Commission, <br /> the stormwater management/erosion control plan shall be accepted by the <br /> Planning Commission and then become a controlling document for the <br /> development. <br /> 3. A site inspection by the City Staff of all erosion control devices shall occur prior <br /> to any construction on the site. The City shall be given seven days notice of when <br /> the inspection is requested. <br /> 4. Prior to submission of a final plat application,the following shall occur: <br /> Minutes 8 <br /> Pequot Lakes Planning Commission <br /> April 17, 2008 <br />