Laserfiche WebLink
to be drained? Mr. Reese stated the pool and spa would have a normal back wash <br /> filtering system. When it is backwashed and flushed, that water will go into wastewater <br /> system. Pool draining scenario occurs once or twice a year; it would be drained through <br /> an underground pipe and it would go into stormwater retention area. Retention area is <br /> designed for this. No screening required between Shoreline Commercial & Residential. <br /> We should make it a condition that common area be rezoned to Open Space at final plat. <br /> We are proposing to place structures within the Open Space. Accessory Structures are <br /> not allowed in Open Space. <br /> Mr. Adams stated that the pool is developed under Dept. of Health or whatever governing <br /> body is, that it conforms to those rules. <br /> Mr. Woog asked regarding pool filtration systems, do they really drain the pool twice a <br /> year and do they need to? Mr. Reese stated that it was his experience in talking with <br /> other pool operators. The State should inspect. <br /> Mr. Hallan asked Mr. Reese regarding the phased construction,the 6 lots to be built in <br /> 2008, is it the intention to be lots 1 through 6 on the west side of the site? Mr. Reese <br /> stated that initially, yes, but could be 6 other units. <br /> Mr. Pederson commented on Item 15,page 9 boat lifts do not need to be dark colored. <br /> Regarding the restoration, if we approve CUP and restoration is not done,they can <br /> �., continue with development? Mr. Marohn stated that if restoration is not done, CUP is <br /> voided. If not completed by June 1, CUP voided. <br /> Mr. Woog stated he would like more planting along storage units as buffer and give <br /> consideration to color of units,natural earth tones. Road along wetland in NE corner, <br /> access to one of those wells? Is road necessary? Mr. Miller stated the trail goes to well <br /> and is constructed now, ,Nit is not paved and drivable to get access to existing wells. Mr. <br /> Connor stated that it is included as impervious. It goes next to wetland delineation. <br /> WSN can firmly verify. r\ ' <br /> We would only table for discussion of second beach—no outstanding issues that we <br /> would need to table for. <br /> A motion was made by Dean Williams, seconded by Tom Adams,to recommend <br /> approval of the Conditional Use Permit, based on the following Findings of Fact: <br /> On the zoning&setbacks <br /> 1. The underlying zone is Shoreline Commercial and Open Space. <br /> 2. The Shoreline Commercial district allows commercial PUD's with a conditional <br /> use permit. <br /> 3. The Commercial PUD is subject to all of the setback requirements of the <br /> underlying zone, in this case Shoreline Commercial. <br /> 4. All of the units are outside of the 75 foot shoreline setback. <br /> Minutes 5 <br /> Pequot Lakes Planning Commission <br /> April 17, 2008 <br />