My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 - Cole Memorial aBuilding Repairs
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2012
>
09-04-2012 Council Meeting
>
09.02 - Cole Memorial aBuilding Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 8:03:24 AM
Creation date
1/2/2014 3:52:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� 1. Roofing labor — Neumann Construction -$5,600 <br />2. Roofing materials — Pro-Build - $5,990.74 <br />3. Gutter installation — Pro-Build - $1,995 <br />4. TOTAL COST OF PROJECT -$13,585.74 <br />I am requesting to use the balance of the general building <br />capital outlay carryover account which is $5,560. This <br />leaves a shortfall of $8,026.34. There will be funds <br />remaining in the Roads and Streets capital outlay budget to <br />cover this overage amount. <br />Council Action Requested: Accept the quotes as <br />proposed with a total proj ect cost of approximately $13, 5 86 <br />with funding from the General Building capital outlay <br />carryover account and Roads and Streets capital outlay <br />�, account. <br />�.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.