My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-15-2011 Planning Commission Minutes
Laserfiche
>
Planning & Zoning
>
Minutes
>
2011
>
09-15-2011 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 10:19:15 AM
Creation date
5/18/2016 10:19:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Make recommendation to the City Council to adopt the Code; or <br /> 3. Since we don't have a full Commission in attendance,think about it until next <br /> month. <br /> It was the consensus of the Planning Commission to continue discussion at the October <br /> meeting. <br /> The Breezy Point Inspector, Scott Sedusky, was in attendance and will supply additional <br /> information and examples for next month. <br /> c. KC Companies <br /> Mr. Marohn explained that Tommy Woog,member of the Economic Development <br /> Committee,has brought the facelift that KC Companies had done to his attention. KC <br /> Companies did a phenomenal job renovating the storefront of their building along Front <br /> Street. That is investing in the community. <br /> d. Fleck Project Update,John Koupal—Start to Finish Remodeling <br /> Mr. Koupal explained that he is asking permission to remove and replace the roof on the <br /> Fleck residence. It is a non-conforming structure and they are constructing a 50% <br /> addition. <br /> He stated the supporting piers for the porch area had sunk;they removed them, dug down <br /> 5 feet and filled it with concrete. They are piers, not a block foundation. He also stated <br /> he couldn't see the roof rafters until the sheetrock ceiling had been removed. <br /> Mr. Marohn stated they could rebuild a new structure in the exact dimensions. They can <br /> maintain and repair the existing. He also explained the statute changes. Removing and <br /> replacing the piers are structural changes. <br /> The wall on the lakeside (porch area)will need to be reinforced; it will have new <br /> windows and headers. The foundation for the rest of the structure will not be reinforced; <br /> the 3 piers are new. <br /> Mr. Marohn explained there are only 2 options: <br /> 1. Follow the conditions of the permit and City Code; or this project is done and <br /> their only option is to build a new house 75 feet back from the lake; <br /> 2. Acknowledge we understand these plans; they are not major changes but are <br /> outside the spirit of the City Code. For this application it is not a huge difference <br /> and will not be more noticeable from the lake. <br /> It was the consensus to allow the reasonable option. However, homeowners should look <br /> ahead and do due diligence ahead of time to be sure structure is solid. <br /> Mr. Marohn explained that this action is an interpretation of the City Code, not a <br /> Variance request. They have the right to maintain the existing structure which would <br /> include replacement of the ceiling with equivalent roof truss system and a bearing wall on <br /> the outside lakeside wall, being consistent with Section 4 of the Code. <br /> Minutes 3 <br /> Pequot Lakes Planning Commission <br /> September 15, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.