My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-16-2014 Planning Commission Minutes
Laserfiche
>
Planning & Zoning
>
Minutes
>
2014
>
01-16-2014 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 9:17:59 AM
Creation date
5/18/2016 9:17:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sjoblad explained there was interest to go to area resorts and pick up tourists and <br /> shuttle between Nisswa and Pequot Lakes. This was determined to be a low <br /> priority. <br /> 17. Take steps to encourage the development of living units above businesses in the <br /> downtown area. Mr. Burslie explained this would create more intensive use in <br /> the buildings in the downtown area. <br /> 18.Establish a Subsurface Sewage Treatment System (SSTS)monitoring program <br /> to ensure ongoing maintenance and compliant operation of systems throughout <br /> the City. Mr. Burslie explained that Emily has a program that is easy to develop <br /> and use; there is a need for inspection programs. The Planning Commission will <br /> request direction from the City Council. <br /> 19.Identify and establish well-marked routes that more directly connect <br /> snowmobile and bicycle traffic from the regional trail system into the city. Chair <br /> Seils reported the trail from Breezy Point into town is now marked with <br /> temporary signage. The Planning Commission determined this a high priority. <br /> Chair Seils opened the Public Hearing. <br /> PUBLIC HEARING: <br /> APPLICANT: Wilderness Resort Villas, LLC <br /> Applicant requests Amendment to Conditional Use Permit to allow a 3-story <br /> lodge, expand existing beach area, create an additional beach, relocate a <br /> boat ramp and allow motorized traffic on walking trail. <br /> Mr. Burslie explained the Staff recommendation is for this application to be tabled <br /> tonight, with a decision at a later meeting. The applicant is intending to submit a <br /> Preliminary Plat request to go along with this CUP request. The purpose of tonight's <br /> meeting is to review what they propose to do and take public comment. Tom Steffens, <br /> applicant,was present. <br /> The Staff Report is divided into separate topics from the CUP application as follows: <br /> The Lodge: <br /> Mr. Burslie explained the Staff Report. The Planning Commission is not looking at <br /> density or lot configuration tonight; that will be part of the Preliminary Plat review. We <br /> need to be sure the height does not exceed 25-foot height. We need a clear drawing <br /> indicating height and a drawing indicating existing grade. The ordinance does not say <br /> existing grade, but that is the unwritten intent. We need to know the existing <br /> topography to establish a point to measure from. The Planning Commission can <br /> determine the intent and purpose of the ordinance. The word"existing" is underlined in <br /> the Staff Report; it is not included in the definition, but it is the intent. <br /> Minutes <br /> Pequot Lakes Planning Commission <br /> January 16, 2014 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.