My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-20-2015 Planning Commission Minutes
Laserfiche
>
Planning & Zoning
>
Minutes
>
2015
>
08-20-2015 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 9:06:53 AM
Creation date
5/18/2016 9:06:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Construction shall be limited to buildings indicated on official site plan on file with <br /> the Planning and Zoning office, including maintenance building, clubhouse, and <br /> irrigation pump station. The applicant shall provide building plans and structure <br /> elevations to be filed with the Planning and Zoning Office and applicant will be <br /> responsible for all necessary construction permits. Each additional structure <br /> greater than loo square feet in ground cover shall require an amended conditional <br /> use permit. <br /> 7. Management shall construct/replace wetland vegetation buffers along all <br /> protected wetlands that include a minimum of 20 feet of undisturbed vegetation <br /> and 30 feet of managed vegetation if disturbed during construction. <br /> 8. Management shall maintain a minimum six (6) foot elevation separation between <br /> greens, tees, intensely managed areas and the saturated zone and 4.5 feet above <br /> the saturated zone for airways. <br /> 9. Management shall construct and maintain nutrient/water retention basins in <br /> areas adjacent to tee boxes and greens and other intensely managed areas as <br /> indicated on the official site plan. The storm water management plan shall be <br /> reviewed and approved by the MPCA and shall at a minimum use National Urban <br /> Run-off Program (NURP) standards. <br /> 10. Management shall construct runoff monitoring sites with a catch basin to collect <br /> runoff from storm events. Information from the monitoring sites and lysimeters <br /> will be reported to the Planning and Zoning Office and Citizens task force four <br /> times during the golfing season and will be used to manage nutrient and pesticide <br /> application rate and timing. <br /> 11. Structure setbacks from adjoining residentially zoned property shall be a <br /> minimum of 50 feet, with existing vegetative screening preserved. <br /> 12. Management shall install and maintain during construction a silt fence or other <br /> approved erosion control barrier along all disturbed soils within 50 feet of any <br /> delineated wetland. The barrier shall be maintained until sufficient grass or other <br /> vegetation is established. The erosion control plan shall be reviewed by the Crow <br /> Wing County Soil and Water Conservation District and Soil Conservation Service. <br /> 13. The septic system designs shall be approved by the Planning and Zoning Office in <br /> accordance with Minnesota Pollution Control Agency 7080 - 7083 Rules. <br /> 14. Management shall not excavate or dredge any protected wetlands. All other <br /> dredging/excavation plans shall be reviewed by the SWCD and Planning and <br /> Zoning Office prior to changes to golf course. <br /> 15. Management shall submit an erosion and sedimentation plan to the Planning and <br /> Zoning Office that includes: <br /> A. Delineated wetlands <br /> B. Existing and ultimate contours and steep slopes <br /> C. Vegetation buffer zones along sensitive areas (steep slopes,wetlands) <br /> D. Potential erosion areas <br /> E. Location of sedimentation and erosion control measure <br /> MINUTES 4 <br /> Pequot Lakes Planning Commission <br /> August 20, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.