My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7B - TH 371 Alternate Alignment Zoning
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2009
>
05-21-2009 Planning Commission Meeting
>
7B - TH 371 Alternate Alignment Zoning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2016 2:27:03 PM
Creation date
5/16/2016 2:27:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Analysis of Commercial Zoning along the TH 371 Alternate Alignment <br /> Commercial zoning along the Highway 371 Alternate Alignment would cost the City <br /> financially substantially more than it would bring in tax revenue. To develop the <br /> properties along the Alternate Alignment commercially, the most optimistic scenario <br /> would have the City enacting a substantial tax increase on all taxpayers, just to get <br /> municipal utilities to the properties. <br /> Such a move would not address issues the City has with maintaining existing <br /> infrastructure in the downtown, for which a substantial financial obligation already <br /> exists. It would also place existing businesses in the difficult position of subsidizing <br /> competing enterprises on the periphery of the City's commercial area at a time when <br /> they are undergoing the financial stress of transitioning from the economics of a <br /> through-town alignment to that of an alternate route. <br /> To protect the investments of those that have committed to City of Pequot's <br /> downtown, City policy should focus on keeping tax rates low while striving to undertake <br /> those endeavors that strengthen existing businesses and create a regulatory <br /> environment where compatible and complementary enterprises can flourish. The <br /> obligations of maintaining the current infrastructure in the downtown are daunting as it <br /> is. Maintaining these assets, while making better use of them, is critical to the long-term <br /> financial health of the City. <br /> 1A <br /> If the property along the alternate alignment is to be developed commercially, it can <br /> either be done with municipal utilities (sewer and water) or without city utilities. Both of <br /> these alternatives have been examined, with the following offered for consideration. <br /> With Municipal Utilities <br /> The Comprehensive Plan and the City's ordinances require that any property not <br /> currently zoned Commercial needs to be served by municipal utilities before the zoning <br /> would be changed. <br /> If the City is to proceed with extending municipal utilities, the City Engineer has <br /> indicated that it will cost an estimated $1,526,000 to extend the utilities across the new <br /> highway alignment. This does not include the cost to run the utilities along the corridor, <br /> but simply to get them across in order to make that possible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.