My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9A - P & Z Admin Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2009
>
08-20-2009 Planning Commission Meeting
>
9A - P & Z Admin Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2016 11:30:44 AM
Creation date
5/16/2016 11:30:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> Download My Contact Information as V-Card <br /> engineering I architecture I land surveying I environmental services <br /> NA Please consider the environment before printing <br /> This email and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed.If <br /> you are NOT the intended recipient or the person responsible for delivering the e-mail to the intended recipient,be advised that you have received this <br /> e-mail In error and that any use,dissemination,forwarding,printing,or copying of this e-mail is strictly prohibited. <br /> This email has been scanned for viruses by VYdselh SmiUm Nolting using Fortinet—and TrendMic(ol Anti-Virus Technologies. <br /> From: Willis Hoyt(mallto:WHoyt @landecker.com] <br /> Sent: Thursday,July 02, 2009 12:00 PM <br /> To:Tim Houle <br /> Cc: carcol @infotelcom,com; Sandy Peine; Mike Loven; Mike Rude <br /> Subject: RE: Pequot Lakes -Trailside Estates <br /> Hi Tim, <br /> Car-col completed exploratory excavations on July 1 and 2, 2009. <br /> Eight, about one foot diameter holes,were excavated by jetting and vacuum. <br /> Please refer to the plan sheet dated 3/17/09 proposing insulating pipe with depths of cover less than eight feet <br /> from 7+20 to 11+00. <br /> Foilowing are measured depths of cover from those eight locations: <br /> Hole Number Approx. Road Station Depth of Cover <br /> 1 7+64 9'R 7'6" — <br /> 2 8+22 14'R _ 7'0" <br /> 3 8+93 8'R 6'11" <br /> 4 9+48 9'R 7'0" <br /> 5 10+28 7'R 7'1" <br /> 6 10+89 6'R 81" <br /> 7 11+29 14'R 8"10" <br /> 8 11+72 81 8'6" <br /> Based upon these results I would recommend revising the proposed insulating to starting at about 7+20(ex. <br /> Insulation over storm sewer)to ending at station 10+89 (exploratory hole#6). It appears that perhaps only <br /> the South road lane could be removed and replaced (rather than both lanes). <br /> Please contact me to discuss the above further. <br /> Sincerely, <br /> Will. <br /> Willis A. Hoyt, P.E. <br /> Landecker&Associates, Inc. <br /> 4646 County Road 11 <br /> P.O. Box 120 <br /> Pequot Lakes, MN 56472 <br /> Toll Free Phone(888)866-4940 <br /> Office Phone(218)568-4940 <br /> Office Fax(218)568-5404 <br /> Cell Phone(218)821-3535 <br /> 7/28/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.