October 15, 2010, 2010 <br /> Zoning Administrator, City of Pequot Lakes <br /> 4638 County Road 11 <br /> Pequot Lakes, MN 56472 <br /> Re: PIN 291140050040009 <br /> 3620 Fox Lane <br /> Dear MS Bittner: <br /> The timeframe for completion is by November 15, 2010. Hopefully most if not all will <br /> be done by November 1, 2010. The person that is hired to coat the foundation is <br /> currently about half way done with a cultured stone job that he told us that he had to be <br /> completed on October 20, 2010. At 1230 pm today he said the deadline is now October <br /> 30, 2010. He thinks he will be done sooner than the 30`h and he may be able to work on <br /> this project 1 or 2 days next week. He still hopes to be done by the end of this month. <br /> The porch is also progressing well. About two thirds of the dirt that needed to be added <br /> under the porch is in place. The hole is dug for the relocated support, and the other 2 <br /> supports are ready to be extended to the proper height to be above grade in order to meet <br /> the building code. The concrete should be poured Monday and then given a day or two to <br /> cure. The rest of the dirt will be put in place, and the same frame work that was there <br /> previously, should be back in place by next weekend. Then it will just be putting down <br /> the decking to complete the porch. This should also be able to be completed by the end <br /> of the month. <br /> i <br /> I do request to have until November 15, 2010 just in case weather or some other <br /> unforeseen delay occurs. <br /> Sincerely <br /> Randon Johnson <br /> Owner of record <br />