My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2012
>
08-07-2012 Council Meeting
>
09 - Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2014 5:52:32 PM
Creation date
12/19/2013 3:35:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />� <br />Wastewater Deqt. <br />I. <br />II. <br />Facilitv Performance: <br />a. CBOD Concentration <br />Influent — mg/1 <br />Effluent — mg/1 <br />b. TSS Concentration <br />Influent — mg/1 <br />Effluent — mg/1 <br />(No Design Listed) <br />(No Design Listed) <br />c. Effluent Fecal Coliform — N/A <br />Permit Condition — 200 organisms/100 ml <br />d. Flow - Average Daily Flow — 67,203 gallons <br />Maximum Daily Flow — 81,651 gallons <br />Minimum Daily Flow — 57,552 gallons <br />Total Monthly Flow — 2,083,311 gallons <br />Operations and Maintenance: <br />(Design —121,795 gal/day) <br />• The monthly MPCA Discharge Monitoring Report (DMR) was completed and <br />submitted. <br />• No Sewer Calls this month. Started the annual sewer jetting of the entire system. Had <br />Jeremy Files return the Cities root saw. <br />• Prepared the Irrigators for use. Had to call in Minn. Valley Irr. With several <br />breakdowns of the old Irrigators. The City should look into replacing the Irrigators with <br />a permanent solution like a Rapid Infiltration basin. <br />• Discharged 7:33 Million Gallons to the Spray Sites. <br />• Irrigator 3, or the West irrigator needs to have a new end gun, holes welded in the <br />Influent line and the Automatic Valve is not functioning properly. <br />• Sprayed weeds on the pond rip rap. <br />• Blowers 1& 2 replaced the hour meters. <br />• Pulled Rags from pumps at Brown & Heath. <br />• Completed lift station annuals, Pump 2 at main lift station has failed. Sent to DPC to get <br />quote, bad impeller,(previous operator(s) put low grade impeller on it and now it has <br />taken out the bearings and seals plus the impeller has wore out prematurely. <br />Report Submitted By: Lee Bundy (Water/Wastewater Manager) <br />Please call me if you have any questions/comments. <br />� 218-568-5604 or 218-330-3940 <br />
The URL can be used to link to this page
Your browser does not support the video tag.