My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3B - Entire Plan Draft
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2010
>
11-18-2010 Planning Commission Meeting
>
3B - Entire Plan Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 3:59:52 PM
Creation date
5/13/2016 3:59:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 C Mitigate effects of development in high erosion areas by requiring the use of erosion control mats, silt <br /> 2 fences,gravel berms,and trenches during construction. <br /> 3 - Restrict new water oriented accessory structures within the shoreline setback zone. <br /> 4 C Regulate the use of rip rap on lakeshore properties through an ordinance ensuring its effective use. <br /> 5 C Reduce surface run-off and sedimentation from roads and impervious surface in new plats by requiring <br /> 6 bioretention ponds,berms,swales,or filter strips.Stormwater management techniques must be prepared <br /> 7 by a certified engineer and shown in detail on all development proposals. <br /> 8 = Encourage cluster developments and planned unit developments (PUDs) that allow high-density <br /> 9 development, protect open space, and set performance standards to preserve and connect contiguous <br /> 10 tracts of open space and natural resources on new developments. <br /> DRAFT-November 2010 28 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.