My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3B - Entire Plan Draft
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2010
>
11-18-2010 Planning Commission Meeting
>
3B - Entire Plan Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 3:59:52 PM
Creation date
5/13/2016 3:59:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 SHORT-TERM ACTIONS WITHIN 1 YEAR): <br /> 2 = <br /> 3 MID-TERM ACTIONS(1-5 YEARS): <br /> 4 = <br /> s LONG-TERM ACTIONS(5 YEARS AND BEYOND): <br /> 6 - <br /> 7 PREVIOUSLY COMPLETED ACTIONS <br /> 8 - Provide opportunities for local businesses to leverage capital through the use of public funds such as <br /> 9 through tax increment financing (TIF), revolving loans, or the installation of community development <br /> 10 corporations. <br /> 11 = Require extractive use companies to restore the natural and scenic conditions of the land back to its <br /> 12 original form prior to extraction. <br /> 13 = Provide incentives for infill and redevelopment of local businesses in the downtown area. <br /> 14 <br /> is <br /> DRAFT-November 2010 23 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.