Laserfiche WebLink
12. The deviation from the Ordinance would not be in keeping with the spirit and <br /> �. intent of the Ordinance. The ordinance allows for the ongoing maintenance of <br /> existing non-conforming structures, but requires new structures to conform to <br /> the code. <br /> 13. The variance will not create a land use not permitted in the zone. The variance is <br /> for a residential dwelling, which is an allowable use in the Shoreline Residential <br /> Zone. <br /> 14. The variance will not alter the essential character of the locality. <br /> 15. The variance is not for economic reasons alone, but reasonable use of the <br /> property does exist under the ordinance. <br /> On the Installation of the SSTS: <br /> 16. The strict interpretation of the Ordinance would create an undue hardship for the <br /> installation of a SSTS. There does not appear to be adequate space, without <br /> encroaching into the sideyard and lakes setbacks,for a private sewer system. <br /> 17. The strict interpretation of the Ordinance would be impractical because of <br /> circumstances relating to lot size, shape, topographic, or other characteristics of <br /> the property not created by the land owner. The subject property has <br /> topographic limitations that restrict the areas suitable for SSTS installation. <br /> 18. The deviation from the Ordinance with any attached conditions will still be in <br /> keeping with the spirit and intent of the Ordinance. <br /> i9. The variance will not create a land use not permitted in the zone. The variance is <br /> for placement of an SSTS, which is an allowable use in the Shoreline Residential <br /> Zone. <br /> 20.The variance will not alter the essential character of the locality. <br /> 21. The variance is not for economic reasons alone, but reasonable use of the <br /> �- property does not exist under the Ordinance. <br /> Board of Adjustment Direction: The Board of Adjustment can approve, deny, or <br /> table this variance to gather additional information. <br /> Staff Recommendation: At the October meeting, members of the Planning <br /> Commission suggested that they would be open to a maintenance project that would <br /> allow for the fixing of the foundation, including construction that would provide for a full <br /> basement, if the impervious coverage were reduced to less than 25% and stormwater <br /> management was done to stop direct runoff into the lake. <br /> Staff met on site with the applicant and the plan that is submitted is as was discussed at <br /> the property. The lakeside deck is removed and replaced with a walkway, the pavers in <br /> the shore impact zone are removed, the driveway is reduced significantly and rain <br /> gardens are strategically placed so as to effectively handle most runoff events. <br /> If the Planning Commission is inclined to approve the variance request, we would <br /> recommend consideration of the following TWO conditions of approval (recommended <br /> conditions from last month still shown for reference): <br /> i. To Faitigate the enereaehment inte the lake v <br /> , the deek en <br /> `y ue i . west oiva, <br /> the i <br /> e ho�sn Hari a removed. it be ., ,..1.,,.e it the step ,7.,..,.,, f e the <br /> siraccdre. <br /> Kivu biv'v'v ua <br /> Pequot Lakes Staff Report 4(a)-5 <br /> Novmeber 18,2010 <br />