My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9A - Minutes 081910
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2010
>
09-16-2010 Planning Commission Meeting
>
9A - Minutes 081910
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 2:53:57 PM
Creation date
5/13/2016 2:53:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
portion of the property is primarily wetland. No development is proposed in the <br /> wetland. <br /> 36. The only allowed beach and picnic area is located on the southern part of the <br /> western edge of the property. These areas have been consolidated into one area to <br /> reduce their overall impact. <br /> 37. The PUD is allowed up to 34 mooring sites; one site for each unit originally <br /> available in the first tier. The PUD is also allowed one day dock for loading and <br /> unloading for units beyond the first tier. The PUD exceeds the allowed number of <br /> mooring sites with a proposed 40 mooring sites. The existing CUP for the resort <br /> provides for 40 mooring sites. <br /> 38. The mooring sites are subject to location and configuration as per consultation <br /> with the Department of Natural Resources. <br /> 39. A vegetation enhancement plan is currently in place, but will need to be updated <br /> as part of this proposal. <br /> Other <br /> 40. Middle Cullen Lake has 29, 416 feet of shoreline, as per GIS data provided by <br /> Crow Wing County. Wilderness Resort has a total of 2,653 feet of shoreline. The <br /> resort comprises 9.0% of the total shoreline on the lake. <br /> 41. Each unit is required to have 1.5 parking spaces, which is identified on the site <br /> plan. <br /> 42. The survey does not indicate where any signage will be placed. Signage will <br /> require a separate permit. <br /> Subject to the following Conditions: <br /> 1. All previous Conditional Use Permits on this property are superseded by this <br /> permit. All previous CUP's are null and void. <br /> 2. Prior to submission of a final plat application, the following shall occur: <br /> a. The applicant shall submit a stormwater management/erosion control plan <br /> that handles the 100-year,24-hour storm event in perpetuity. <br /> b. The stormwater management/erosion control plan shall be reviewed by the <br /> Planning Commission. The plan will be revised as directed by the <br /> Planning Commission. <br /> c. Following review and revision as directed by the Planning Commission, <br /> the stormwater management/erosion control plan shall be accepted by the <br /> Planning Commission and then become a controlling document for the <br /> development. <br /> 3. A site inspection by the City Staff of all erosion control devices shall occur prior <br /> to any construction on the site. The City shall be given seven days notice of when <br /> the inspection is requested. <br /> 4. Prior to submission of a final plat application,the following shall occur: <br /> a. The applicant shall submit updated rental contract and association <br /> contracts to the City Attorney for review and approval. The documents <br /> shall address the following, at a minimum: <br /> i. The continued operation of Wilderness Resort as a commercial <br /> resort. <br /> Minutes 7 <br /> Pequot Lakes Planning Commission <br /> August 19, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.