My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8Aii - Comprehensive Plan Discussion - Recreation
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2010
>
02-18-2010 Planning Commission Meeting
>
8Aii - Comprehensive Plan Discussion - Recreation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 12:18:36 PM
Creation date
5/12/2016 12:18:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ❑ Work with the State and County to allocate land for additional City parks,natural areas,and greenways. <br /> 2 ❑ Carefully mark and protect existing trail right-of-way so the trail system can be permanently protected <br /> 3 and easily managed as the City grows and develops. <br /> 4 ❑ Require trail right-of-way in new developments where trail connections are needed. <br /> 5 ❑ Consider making Grant-In-Aid trails available for summer as well as winter use. <br /> 6 ❑ Encourage non-boat use of lake resources by providing scenic overlooks,shoreland walkways,and fishing <br /> 7 piers. <br /> 8 ❑ Work with the Crow Wing County Parks and Recreation Department to create additional recreational <br /> 9 opportunities,such as a mountain biking course, public pool, equestrian trails, community center and an <br /> 10 exposition park and community forest. <br /> 11 LONG-TERM ACTIONS (5 YEARS AND BEYOND): <br /> 12 ❑ Create a plan for adequate parking, cross-walks, and trail service areas where major roads cross the Paul <br /> 13 Bunyan Trail. <br /> 14 ❑ Develop a loop trail connection to the Paul Bunyan Trail. At minimum, specially designed highway <br /> 15 shoulders can provide short connections; however, the City should seek to provide trails or sidewalks <br /> 16 separate from the road wherever feasible. <br /> 17 ❑ Manage existing public lakeshore carefully to maximize public benefit without negatively impacting the <br /> 18 natural lake ecosystem.Encourage complementery uses and balance. <br /> 19 ❑ Limit the impact of new lakeshore developments through scenic and natural preservation standards. <br /> 20 ❑ Create a master plan that designates potential priority sites for future parks, a public swimming beach, <br /> 21 playgrounds, and trail sites and corridors. The locations of these sites should be done according to site <br /> `.. 22 analysis and established criteria.Acquire these sites through purchase,gift,or trade;and develop them as <br /> 23 needed. <br /> 24 ❑ Always look initially at the existing public land base and explore joint management and expansion of <br /> 25 existing facilities before private land is acquired for the future development of local recreation facilities <br /> 26 such as trails,parks,camping and picnicking. <br /> 27 ❑ Work with local Lake Associations to regulate water surface use on City lakes by establishing no-wake <br /> 28 zones,traffic management strategies,horsepower limits and time-of-day use restrictions. <br /> 29 PREVIOUSLY COMPLETED ACTIONS <br /> 30 ❑ Charge the City's Parks and Recreation Committee with directing the implementation of these strategies. <br /> 31 ❑ Reevaluate the requirement of park dedication fees in new subdivisions and planned unit developments. <br /> 32 ❑ Inventory and catalogue all public land parcels in the City and seek to expand recreational uses on these <br /> 33 parcels. <br /> 281 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.