My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4A - Variance to Construct in Bluff & Lake Setback
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2010
>
02-18-2010 Planning Commission Meeting
>
4A - Variance to Construct in Bluff & Lake Setback
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 11:59:06 AM
Creation date
5/12/2016 11:58:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the project is to replace the original cabin that is under-insulated and under- <br /> structured with a new space to create a year round retirement home." State Statutes give <br /> property owners a right to maintain non-conforming structures, including repair and <br /> replacement. Although the property owner could not expand the structure under these <br /> provisions, they are certainly allowed to repair the insulation and structural problems, <br /> including replacement of the current structure in the exact same footprint as it sits now. <br /> The proposed request falls outside of the scope of what is allowed in the Code. The <br /> expansion of the structure within the bluff and lake setback can't be supported within the <br /> parameters of a variance request. There is no hardship, and reasonable use already exists <br /> on the property. <br /> The lot has ample room for the entire structure to be replaced (and expanded) in a <br /> conforming location. There is also ample room for a one time addition that would not <br /> encroach into any setbacks. Staff cannot recommend that this variance request be <br /> approved. <br /> Should the Board of Adjustment decide to approve the request, we would recommend <br /> doing so with consideration of the following conditions: <br /> 1. The applicant shall ensure that erosion control practices are in place prior to any <br /> construction through the use of silt fencing or other erosion control measures. <br /> 2. A stormwater management plan shall be implemented after construction. The <br /> plan shall be prepared for staff to review and approve prior to implementation. <br /> Pequot Lakes Staff Report 4(a)-3 <br /> February 18,2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.