My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9A - Wilderness Resort Submittals
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2011
>
04-28-2011 Planning Commission Meeting
>
9A - Wilderness Resort Submittals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 3:30:02 PM
Creation date
5/6/2016 3:29:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CommuNrrV Goof <br /> GROvr� I'e1quot _ <br /> INSTITUTE ' <br /> NEW BUSINESS <br /> Agenda Item: 9(a) Wilderness Submittals <br /> Background Information: Jeff Miller will be present on behalf of Wilderness Resort <br /> to discuss their submittals and their application for a final plat. <br /> The outstanding conditions from the preliminary plat approval are listed below: <br /> 2. Prior to submission of a final plat application,the following shall occur: <br /> a. The applicant shall submit a stormwater management/erosion control <br /> plan that handles the loo-year, 24-hour storm event in perpetuity. <br /> b. The stormwater management/erosion control plan shall be reviewed by <br /> the Planning Commission. The plan will be revised as directed by the <br /> Planning Commission. <br /> c. Following review and revision as directed by the Planning Commission, <br /> the stormwater management/erosion control plan shall be accepted by <br /> the Planning Commission and then become a controlling document for <br /> the development. <br /> 4. Prior to submission of a final plat application,the following shall occur: <br /> a. The applicant shall submit updated rental contract and association <br /> contracts to the City Attorney for review and approval. The documents <br /> shall address the following, at a minimum: <br /> i. The continued operation of Wilderness Resort as a commercial <br /> resort. <br /> b. Revisions shall be made to the documents to the satisfaction of the City <br /> Attorney. <br /> C. Once acceptable to the City Attorney, the documents shall be reviewed <br /> by the Planning Commission. Revisions shall be made to address <br /> Planning Commission concerns. <br /> d. Once Planning Commission member's concerns have been addressed, <br /> the Planning Commission shall approve the documents and they shall <br /> become controlling documents for the development. <br /> 5. Prior to submission of a final plat application,the following shall occur: <br /> a. The applicant shall submit information showing sewage treatment design, <br /> including capacity,treatment capability and conveyance mechanism. <br /> b. The sewage treatment design shall be reviewed by the City Engineer. <br /> Revisions to the plans shall be made to the satisfaction of the City <br /> Engineer. <br /> C. Once acceptable to the City Engineer, the design shall be reviewed by <br /> the Planning Commission. Revisions shall be made to address Planning <br /> Commission concerns. <br /> d. Once Planning Commission member's concerns have been addressed, <br /> the Planning Commission shall approve the design and it shall become a <br /> controlling document for the development. <br /> 6. Prior to submission of a final plat application,the following shall occur: <br /> Pequot Lakes Staff Report 9(a)-1 <br /> April 28,2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.