My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9A - Minutes 042811
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2011
>
05-19-2011 Planning Commission Meeting
>
9A - Minutes 042811
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 11:20:04 AM
Creation date
5/6/2016 11:20:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONS OR DELETIONS TO AGENDA: <br /> Add under New Business: <br /> 8. d. American National Bank Sign; <br /> 8. e. Update by John Derksen. <br /> OPEN FORUM <br /> None <br /> NEW BUSINESSS: <br /> a. Grow Zone Expansion Area <br /> At the end of the Comprehensive Plan process, one strategy was expanding the Grow <br /> Zone approach to the surrounding neighborhoods m�g �t a patter based code rather <br /> than a use code, focusing on making this a higher r end private sector investment. <br /> This will take a number of months and the propg e area can be changed.as discussion <br /> allows. <br /> v , <br /> This can be paralleled with the Walkabllity Study. �� �l need volunteers to actually <br /> collect the data. The volunteers will be trained costs down while <br /> continuing o move forward. Some of the nformatian is a r ble through aerial photos, <br /> g A; <br /> but visual data is also needed. This falls iriW', anning mand 'a Planning <br /> Commission and does not need a directive from`the;City Court <br /> Approximately 16 vol X111 be needed,spending about 1 '/z hours each with teams <br /> p <br /> of 2. It was sugges- have e female per team to stay focused. Volunteers: Tom, <br /> Scott, Cheri and�ar <br /> 3 <br /> b.Walkabili td <br /> ,Y Y fin, r h <br /> (Discussed above <br /> c. Capital Obligations Inventory <br /> This is another strategy from the comprehensive Plan. We can update information that <br /> the Roads and streets Department maintains. We will analyze it and hope to present an <br /> update next month' We may ultimately come back and need volunteers again. This is a <br /> high priority item that can be used for budgeting. <br /> d. American National Bank Sign <br /> Chairman Pederson explained that the existing time and temperature portion of their sign <br /> is broken and they can no longer get parts to repair. The sign to replace is somewhat <br /> smaller–21 sq. ft. vs. 10 sq. ft. Only the digital part is being replaced. <br /> Mr. Marohn clarified that State Statutes state existing non-conforming uses have the right <br /> to maintain it and replace it indefinitely. We do have an obligation to allow them to do <br /> something with this. If the Planning Commission wants to approve the smaller size, the <br /> Planning Commission has the authority to direct Staff to issue a permit with no <br /> MINUTES 4 <br /> Pequot Lakes Planning Commission <br /> April 28, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.