Laserfiche WebLink
areas, and natural depressions for infiltration rather than <br /> �.. buried pipes and human-made materials and facilities. <br /> (2) Development must be planned and conducted in a manner <br /> that will minimize the extent of disturbed areas, runoff <br /> velocities, erosion potential, and reduce and delay runoff <br /> volumes. Erosion prevention and sediment control <br /> practices must be used to retain sediment on site. <br /> Disturbed soil areas must be stabilized and protected as <br /> soon as possible. The maximum time the soil in a project <br /> area can remain exposed when the area is not actively <br /> being worked is 3 days. Temporary or permanent cover for <br /> the exposed areas is required at that time but should be <br /> installed sooner if possible. All deltas and sediment <br /> deposited in surface waters, including drainage ways, catch <br /> basins, and other drainage systems must be removed <br /> within 14 days unless precluded by legal, regulatory, or <br /> physical access restraints. The areas where sediment <br /> removal results in exposed soil must be stabilized within 7 <br /> days after completing the removal. <br /> (3) To the maximum extent possible,land-disturbing activities <br /> must not occur within the shore impact zone. <br /> (4) Impervious surface Coverage: <br /> Coverage <br /> Development or (percent of Applicable <br /> Use Class or District aim licable area Area <br /> Conservation General Development and Riparian lots <br /> Subdivision Recreational Develo ment <br /> Conservation Natural Environment, Special <br /> Subdivision Protection, Sensitive Area and all 12 Riparian lots <br /> river classes <br /> Conservation All classes and districts as Nonriparian <br /> Subdivision lots <br /> total project <br /> Planned Unit <br /> Developments All classes and districts area and ist <br /> tier <br /> (i) AR PUD9 must develop and maintain an eresion eentr-el. <br /> vegetated buffier strips, er other teehniques must be used to <br /> minimize eresien. <br /> (3) Steps shall be taken to insure that disturbed gretind i-s <br /> Pestered or stabilized as seen as pessible after being <br />