My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10 - P & Z Admin Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2012
>
01-19-2012 Planning Commission Meeting
>
10 - P & Z Admin Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2016 2:09:37 PM
Creation date
4/29/2016 2:09:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.The Comprehensive Plan does not specifically address this request. <br /> 11.The use of the signs in the proposed configuration is compatible with the <br /> existing neighborhood. The surrounding properties are used for <br /> commercial purposes. <br /> 12.The proposed use will not impair values nor substantially diminish <br /> properties in the immediate vicinity. <br /> 13.The proposed sign will not impede the normal and orderly development <br /> and improvement of surrounding vacant properties. <br /> 14.The proposed signage will not create a cost for additional public facilities <br /> or services. <br /> 15.The subject property is already established with a vehicular approach to <br /> the property. The proposed sign will be one-sided and will face the <br /> driveway entrance at the north side of the property. <br /> 16.There is no need for additional parking with the request of a sign. <br /> 17.The requested signage will not create any odor, fumes, dust, noise or <br /> vibration. <br /> 18.The proposed use will not cause any pollution to ground or surface waters. <br /> Section 17-11.6 (8) of the Pequot Lakes City Code states "Failure by the owner <br /> to act on a Conditional Use Permit within 12 months, or failure to complete the <br /> work under a Conditional Use Permit within 2 years, unless extended by the <br /> Planning Commission, shall void the permit. A second extension shall require a <br /> new public hearing." If you have any questions, please feel free to contact me. <br /> Sincerely, <br /> Dawn Bittner <br /> Zoning Administrator <br /> CC: Planning Commission <br /> Mid-Minnesota Federal Credit Union <br />
The URL can be used to link to this page
Your browser does not support the video tag.