Laserfiche WebLink
I. The height of the addition shall not exceed the height of the <br /> existing structure. <br /> J. A state licensed building inspector must submit written <br /> documentation arming that the existing building is structurally <br /> sound and can accommodate the proposed addition. <br /> K. Beyond minor alterations needed to accommodate the addition,no <br /> structural modifications shall be made to the original structure <br /> either as part of the project to add the addition or at anytime <br /> within five vears subsequent to completion of the addition. Anv <br /> property owner exercising this option is voluntarily relinquishing <br /> or a period of 60 months, their right to rebuild their existing <br /> structure. <br /> L. No permits shall be granted under this provision for homes <br /> constructed after July 1, 1995 or where a previous variance has <br /> been approved. <br /> M. All other provisions of this Chapter must be complied with. <br /> Pequot Lakes Staff Report 8(a)-3 <br /> January 19,2012 <br />