Laserfiche WebLink
a <br /> - Create a berm at the top of the hill to prevent stormwater from,running down <br /> the slope and directly into the wetland. <br /> - Stabilize the loose material at the top of the hill with permanent ground cover <br /> (grass, shrubs, aggregate material, etc...)to prevent erosion. <br /> - Re-vegetate the top of the hill to provide screening of the structures as viewed <br /> fiom the highway. You indicated that you would be planting some high bush <br /> cranberry trees to provide this screening. <br /> y x <br /> Thank you for all of your cooperation throughout this process. We look forward to <br /> receiving the initialized copy of this memo back fiom you. I can be reached at 218-330- <br /> 6694 if you have any questions. <br /> Sincerely, <br /> CITY OF PEQUOT LAKES <br /> Charles Marohn <br /> Planning and Zoning Administrator <br /> Cc: Planning Commission <br /> Dawn Bittner,Zoning Clerk <br /> *'� Roger Langenbau c <br />