My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8B - Review CSAH 11 Memo
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2012
>
03-15-2012 Planning Commission Meeting
>
8B - Review CSAH 11 Memo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2016 9:26:07 AM
Creation date
4/29/2016 9:26:06 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`.. It is only with this type of design that downtown Pequot Lakes can attract and retain the level of private <br /> sector investment necessary to sustain prior investments.There needs to be natural, market demand for <br /> filling in the gaps between existing structures and,over time, making incremental improvements to <br /> increase the intensity of use of existing structures.This will only happen if(1) people can get to Pequot <br /> Lakes quickly and easily and (2)once in town, can be accommodated in a comfortable,town setting. <br /> Concept#1:The concept put forward by the County labeled"Concept 1" is the closest representation of <br /> what a future CSAH 11 corridor within downtown Pequot Lakes needs to look like.To that concept, as <br /> presented,we suggest the following modifications: <br /> 1. In general,the median should be removed and the automobile travel lanes reduced to 10 feet. <br /> Correspondingly,the sidewalks should be widened by 5 to 6 feet on each side of the street.The <br /> cost difference of moving the concrete from the center of the street—where it has little value— <br /> to the edge of the street where it creates immense value for the adjacent property owners, <br /> should be negligible. Narrowing the lanes will further slow traffic through this section and allow <br /> for a more complex environment to emerge. <br /> 2. The space available at County Road 112 provides an opportunity to offset reduced design <br /> speeds by providing for a continuous flow intersection.A properly-designed round-a-bout <br /> (meaning designed to a neighborhood context, not a highway context)would improve flow and <br /> reduce stacking in this area. <br /> 3. The intersections at Government Drive and N.Washington Ave.should be designed to <br /> emphasize shared space.The intersections should be designed to provide for automobile and <br /> pedestrian traffic in a free flow(not priority)design.Traffic will be going slow enough through <br /> this section where such a design should be attainable. <br /> 4. Ultimately,the intersection with TH 371 needs to be reconfigured to provide for continuous <br /> flow with a complex town environment. For the time being,the design as presented is <br /> adequate. <br /> 5. It is highly questionable what the value of a"future collector roadway"would be as presented. If <br /> said roadway is to be a frontage road along the highway,the improvement would need to be <br /> development driven. If the desire is to provide for industrial traffic,the design for TH 371 <br /> provides for such traffic at the southern junction with the current TH 371 alignment. Extending <br /> E.Woodman St.would be quite costly and it is not clear what benefit it would provide in terms <br /> of adding to the value captured within the downtown, particularly since it would require the <br /> condemnation and removal of at least one home. <br /> As such, it is premature and likely unwarranted to plan CSAH 11 to accommodate such an <br /> improvement.What is planned for areas to the west would also give mixed signals to drivers <br /> leaving the highway, confusing them that they are passing through a high-speed environment, <br /> WWW.COMMUNiTYGROWTH.COM WWW.STRONGTOWNS.ORG <br />
The URL can be used to link to this page
Your browser does not support the video tag.