My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9A - Minutes 062112
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2012
>
07-19-2012 Planning Commission Meeting
>
9A - Minutes 062112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2016 8:32:33 AM
Creation date
4/29/2016 8:32:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chuck will bring a draft next month. <br /> We need to reform and change our street design standards after the ordinance is amended. <br /> We need to get the public realm correct. <br /> PUBLIC HEARINGS: None. <br /> ADDITIONS OR DELETIONS TO AGENDA: <br /> ADD: New Business: <br /> Fleck Stormwater and Landscaping Plan. <br /> OPEN FORUM: <br /> Council Member Akerson informed the Plannin ommission that the will be <br /> holding a brat sale August 3 &4 as a fundrai uper u. They are 1 for <br /> volunteers from 11"am to 4 pm for one-hour shift u n up at the rary and it <br /> is a very good cause. <br /> NEW BUSINESS: <br /> Fleck Stormwater and Landscaping Plan. <br /> Mr. Marohn explained the -conformin e dition and structural <br /> improvements to the e in that rec y took pl e. He presented the <br /> landscaping plan d been miffed an planned that it doesn't meet the intent of <br /> the Planning Co ii or Ci Code with tll ount of grading and rock within the <br /> Shore Impact Zone. <br /> Mr. M furthe ine tormwater issue and the request in the Memorandum. <br /> He e ed the retaiY wall r area north and northwest of the cabin,the <br /> sto etention are the so of the addition, and their plan to plant wild flower <br /> seed for to no mainte e. a concerns are the rock and fill to create the patio <br /> area. They p put in a ck wall but will shorten it. The rock wall will be boulders <br /> 4 <br /> and end near th wal <br /> This plan is more th`' taff can approve as grading. The area needs to be stabilized and <br /> fixed. This would improve the situation a lot. c <br /> The quicker this gets fixed,the less damage is done. Staff was directed to give them a c <br /> drop dead date. The boulders are not rip rap but create the retaining wall. Plantings will <br /> grow up naturally to hide the wall. Vegetation will be allowed to grow, as well as trees <br /> being planted. Bio-logs need to be in place now. k <br /> Staff was directed to inform Ann Beaver, Cullen Lakes Association,what has been <br /> approved and why. <br /> MINUTES 3 <br /> Pequot Lakes Planning Commission <br /> June 21, 2012 <br /> 4 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.