Laserfiche WebLink
INSTITUTE <br /> GROW ZONE EXPANSION <br /> It has taken me a long time to figure out how we can make the transition from the current <br /> layout and development pattern of Pequot Lakes which, as we have seen, is not <br /> financially viable,to a development pattern that was not going to bankrupt the city. We <br /> can see what is there today and envision what we need it to ultimately be, but obviously <br /> the transition is the hardest part. <br /> The reasonable expectations of the residents within the Grow Zone neighborhoods <br /> combined with the fact that development patterns shift slowly over time meant that there <br /> will be resistance to any abrupt transition. Due to the fact that budgets will continue to <br /> tighten while maintenance liabilities grow, funding an expensive transition is also out of <br /> the question. Whatever we do has to improve our financial situation today while <br /> incrementally transitioning to something viable over the long term. <br /> Our July discussion helped me to see how we could incrementally build the public parts <br /> of this system as demand materializes. This is especially true if we can use pervious <br /> construction materials to put off the installation of expensive storm sewer systems until <br /> greater development intensity exists. <br /> Using Washington Avenue as a model that we should repeat throughout the city, we've <br /> prepared a phasing plan that ties together public investments within the right of way to <br /> the adjacent private sector development. Every increment of infrastructure can be built <br /> essentially on-demand as properties mature. <br /> Drawing 1 <br /> The next time Washington Avenue is repaired,this is the street section that should be <br /> constructed: two simple driving lanes with the adjacent right of way kept as green space. <br /> There are no sidewalks or formal parking areas.New buildings start to frame the public <br /> realm with parking and accessory structures behind the principle structure. If needed and <br /> desired, an aggregate shoulder can be built for parking, either for a small section or the <br /> entire length of the street. <br /> Drawing 2 <br /> As properties develop, a 6.5' sidewalk would be constructed four feet from the property <br /> line.Nine foot aggregate shoulders can be installed and, when the demand is there,paved <br /> with bituminous. Buildings continue to add bulk and parking would be on street or <br /> accessed through an alley. No curb cuts across the sidewalk. <br /> Drawing 3 <br /> As properties continue to mature and increase their intensity,the four foot gap between <br /> the walk and the building can be filled in with additional sidewalk. This will allow <br /> outdoor seating and/or awnings that extend within the right-of-way. The roadway can be <br /> Pequot Lakes Staff Report <br /> August 16,2012 <br />