My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - Grow Zone/Gateway Discussion
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
01-17-2013 Planning Commission Meeting
>
3 - Grow Zone/Gateway Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2016 2:53:01 PM
Creation date
4/28/2016 2:52:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drawing-4 <br /> Once the blocks have matured to full intensity(3+story buildings with no gaps between <br /> structures),there will be sufficient tax base to justify the installation of storm sewer.This won't <br /> necessitate ripping out all of the sidewalk but it will require some of it to be removed along with <br /> the road.This would be done.In this condition there would be a full 10.5'walk on each side of <br /> the street,diagonal parking and two way traffic. <br /> I W10119 W�a(9i4 pti-9 WA <br /> e-1 All <br /> Ar <br /> I <br /> '�' • + <br /> � r <br /> /.. <br /> IWO <br /> t <br /> • i •11;x' + ,� � <br /> r• •is • r j • • * '•,�� • `•f • <br />
The URL can be used to link to this page
Your browser does not support the video tag.