Laserfiche WebLink
Drawing-4 <br /> Once the blocks have matured to full intensity(3+story buildings with no gaps between <br /> structures),there will be sufficient tax base to justify the installation of storm sewer.This won't <br /> necessitate ripping out all of the sidewalk but it will require some of it to be removed along with <br /> the road.This would be done.In this condition there would be a full 10.5'walk on each side of <br /> the street,diagonal parking and two way traffic. <br /> I W10119 W�a(9i4 pti-9 WA <br /> e-1 All <br /> Ar <br /> I <br /> '�' • + <br /> � r <br /> /.. <br /> IWO <br /> t <br /> • i •11;x' + ,� � <br /> r• •is • r j • • * '•,�� • `•f • <br />